Verizon-LR 980930VIOISTURE DENSITY Rr-,LATIONS
)ate of Service:
Client No.:
Client:
09/22/1998
THE BECK
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 752,47
Report No.: 9824957
Project No.: 43-2333-98
Report Date
09/30/1998
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Material sampled by technician for moisture density relations.
CONTRACTOR: BECK
TEST FOR: Common
MATERIAL: Lt. Gray Sandy Shaley Clay w/Red
Sand
TWST M~'raOD: ASTM D-698
PROJECT DATA
DATE SAMPLED: 09/22/1998
SAMPLED BY: T. King
SAMPLE LOCATION: On site, 2' below grade, west end of site
XIMUM DRY DENSITY, pcf: 107.0
OPTIMUM MOISTURE CONTENT, %: 1 8.5
Technician: Tex King
Report Distribution:
(I) The Beck Group
(19,'~o~tzky Dupree & Assoc.
t ckette Davis Drake, Inc.~
ae Beck Group
REPORT OF TEST
MOISTURE DENSITY RELATIONS
116 I Zero air v, lids c trve
ISpec tic G ravit, 0.00
112
Dry
Density
(pc0
108
/
100 //
13 15 17 19 21 23 25
MOISTURE CONTENT (%)
Ken Combs
Sr. CME Technician
Quality Assurance Manager
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
Page 1 of 1