Verizon-LR 980923VIOISTURE DENSITY Rv LATIONS
)ate of Service: 09/22/1998
Client No.: THE BECK
Client: The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report No.: 9824552
Project No.: 43-2333-98
Report Date
09/23/1998
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Material sampled by technician for moisture density relations.
CONTRACTOR: BECK
TEST FOR: Common
MATERIAL: Lt Bm/Lt Gray Silty Sand w/Dk
Gray Clay Balls
Tv. ST METHOm ASTM D-698
PROJECT DATA
DATE SAMPLED: 09/17/1998
SAMPLED BY: T. King
SAMPLE LOCATION: On site, south end of site, 4' below grade
.~xlMUM DRY DENSITY, pcf: 116.5
OPTIMUM MOISTURE CONTENT, %: 12.5
Technician: Tex King
Report Distribution:
(1) The Beck Group
(I) Gromatzky Dupree & Assoc.
(l)tk, ockette Davis Drake, Inc.
t' 3eck Group
REPORT OF TEST
MOISTURE DENSITY RELATIONS
126 Zero air v, fids c trve
Spec tic G ravit,; 0.00
122
Dry
Density
(pct')
118
/
7 9 11 13 15 17 19
MOISTURE CONTENT (%)
Ken Combs
Sr. CME Technician
Quality Assurance Manager
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Paee I of I
VIOISTURE DENSITY R. LATIONS
)ate of Service:
Client No.:
Client:
09/22/1998
THE BECK
The Beck Group
Attn: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report No.: 9824551
Project No.: 43-2333-98
Report Date
09/23/1998
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Material sampled by technician for moisture density relations.
CONTRACTOR: BECK
TEST FOR: Common
MATERIAL: Med/Lt Brown Silty Sand w/Some
Sandstone
TEST MET~OO: ASTM D-698
PROJECT DATA
DATE SAMPLe. D: 09/17/1998
SAMPLED BY: T. King
SAMPLE LOCATION: On site, south end of site, 2' below grade
..tMUM DRY DENSITY, pcf: 1 15.0
OPTIMUM MOISTURE CONTENT, %: 13.0
Technician: Tex King
Report Distribution:
(1) The Beck Group
(1) Gromatzky Dupree & Assoc.
(1). B.~rBrockette Davis Drake, inc.
Beck Group ..-
REPORT OF TEST
MOISTURE DENSITY RELATIONS
Zero air v,dds cave
Spec ific G:avitO.OO
120
118
Dry
Density
(pc0
116
114
112
7 9 11 13 15 17 19
MoIsroRE CONTENT
H~ E~.~ing, Inc.
Ken Combs
Sr. CME Technician
Quality Assurance Manager
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Paee 1 of 1
VIOISTURE DENSITY I LATIONS
ENGINEERING, INC.
8901 Carpenter Frwy., Suite/t100
Dallas, Texas 75247
9ate of Service: 09/22/1998
Client No.: THE BECK
Client: The Beck Group
Atto: Gillett Berger
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619
Report No.: 9824550
Project No.: 43-2333-98
Report Date
09/23/1998
Project:
GTE Shared Services
Coppell Road & Corporate Drive
Coppell, Texas
Services: Material sampled by technician for moisture density relations.
CONTRACTOR: BECK
TEST FOR: Corem. on
MATERIAL: Dk Reddish Brown Silty Clayey
Sand w/Gravel
TEST METHOD: ASTM D~698
PROJECT DATA
DATE SAMPLED: 09/17/1998
SAMPLED BY: T. King
SAMPLE LOCATION: On site, north end of site
.XIMUM DRY DENSITY, pcf: 124.5
OPTIMUM MOISTURE CONTENT, %: 10.0
Technician: Tex King
Report Distribution:
(1) The Beck Group
(1) Gromatzky Dupree & Assoc.
( I ~-a-o, ckette Davis Drake, Inc.
t Beck Group
REPORT OF TEST
MOISTURE DENSITY RELATIONS
127 Zerc air v ,ids c ~rve
Spec ific {2 'avit 0.00
125
Dry ~- ~
Density '
123 / ~
121 jI
6 8 10 12 14 16 18
MOISTURE CONTENT (%)
~~.~ Engineering, In~:::~
) Ken Combs
/ Sr. CME Technician
Quality Assurance Manager
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
Paee 1 of 1