Loading...
Villages C P3&4-CS 931025 /~ The City With A Beautiful Future 214-462-0022 October 25, 1993 Mr. Robert Porter Tipton Engineering, Inc. 6330 Belt Line Road, Suite C Garland, Texas 75043 Re: Bond Walk Through - Villages of Coppell III and IV-B Dear Mr. Porter: A recent follow up bond walk through of the above referenced projects was performed on October 13, 1993. The following paving related items were found to be deficient. Villages of Coppell IIIB: 1. South end of Parker construction joint has chips, broken curb patch, and seal. 2. Longitudinal random crack @ 909 - 905 Brentwood. 3. Transverse random crack @ Brentwood and Nottingham. 4. Random crack in the approach on the west side of Nottingham and Brentwood. 5. Construction joint Beau and Parker has large chip @ center line. 6. Random crack in alley approach across form 693 Nottingham. 7. Random crack in alley behind 905 and 913 Brentwood. Villaqes of Coppell IV-B: 1. Random crack @ approach of Cheshire and Lakeview. 2. Random crack @ curb inlet throats on Cheshire. The bonding period for the paving portion of these two projects will be over on November 4, 1993. I am forwarding this information for you to schedule the needed repairs. Please contact my office and provide the anticipated schedule by October 29, 1993. Si ¢ relyo /~onzal~. ~ /Street Superintendent cc: Steven Go Goram, Director of Public Works Larry Davis, Construction Inspection Site Concrete, Inc., P.O. Box 140096, Irving, Tx. 75014-0096