ST9601-CS 980916 TEAGUE NALL AND PERKINS CONSULTING ENGINEERS DATE: 09/16/98 MEMORANDUM TO: Larry Davis, City of Coppell FROM: Mike Jones RE: Wrangler Drive Project (Project No. ST 96-01 ) Pay Estimate No. 3 From Tiseo Paving Company Attached is a copy of the latest pay estimate request from Tiseo Paving Company for their work on the Wrangler Drive project through 08/31/98. Per our discussion yesterday I have made several revisions to the subject estimate to more accurately reflect the work that they had completed as of 08/31/98. I still have a question about the pay item for "ROADSIDE SIGN ASSEMBLY" (Item No. I- 20). I had intended to drive through the project this morning on my way to work, but I got "caught-up" in my normal routine and drove out of town without thinking. The question that I have is whether or not Tiseo installed the stop sign at the WrangledFreeport intersection and a speed limit sign for east-bound traffic between Freeport and Enterprise. If so, then their estimate for three (3) roadside assemblies would be correct. I am fairly certain that I remember seeing those signs the last time I drove down Wrangler, but would appreciate you confirming that today, if possible. The attached estimate still reflects payment for three (3) roadside sign assemblies, however, I will be glad to modify it if this is not correct. Should have any additional questions, please do not hesitate to give me a call. Thanks. ~le:~q:~proj-rl 4\cp196164\docs\corres\memo,davis.payestirnate.no3.wpd 915 FLORENCE STREET 2001 W. IRVING BLVD. FORT WORTH, TEXAS 76102 IRVING, TEXAS 75061 8171336-5773 214/254-1765 PAGE 1 09/lg/98 10:89 CITY,C]~ COPPELL ENGINEERING ~ ~X 476 C~ ~ 7~19 FR~ECT W~LER ~T~OR TISEO PA~NG CO PROJECT NO. ~ AQORE~ :UND o~Lt~. ~ 3RIGI~L CO~T AMT S1~.15 ORDINAL ~N~ ~ME PLUS CH~GE CROERS W~ A~US~E~ JALUE OF WORK ~ ~TE ~ME CH~GED ORIGINAL WORK ITEM UNIT C)F UNIT PRICE E$1'IMATED COMPLETED TO VALUE OF COMPt. ETED NO DESCRIPTION MEASUI~E BID ' QUANTFTIY DATE WORK UNIT 1 SECTION 1 - - i-1 PREPARE RCVV LS $67.0C0.00 1.00 1.00 67.t01~.00 I-2 REMEXCCNCCURBORCONC LF I;.OO 110.00 110.00 220.00 l-3 UNCLASSiFIEO STREET F. XCAVATiON CY $4.50 4218 4,219.00 18,985.50 |-5 LIME F~R SUBGRADE STABILIZATION TON $100.lX! 85.00 `S4./2 8,4/2.130 · 1,6/' REINF. CONC: PAVEMENT W/ 6" 5Y $23.50 5310.00 ~ ~lO ~)~Jl~2' / l-7 CONCRLr~STRE~'THEA(:~R LF $5,00 110.00 l I-8 CONCRETE PAVING-STONE PAVEMENT 5Y $70.00 125.00 I-9 3' PVC CCNDUITSLF. EVE FOR LF $10.00 120.00 106.00 1,C6000 ;-10 PULL BOXES Fr.4 $1.000.00 Z00 I-I 1 ADJ EX WATER VALVE BOX TO GRADE EA $100.00 4.00 4.C0 400.I)0 ~-12 RIb'FORE PARKWAYS &YARDS BLOCK LS $5,(XX),00 1.00 - '?-13 *RESTORE PARKWAYS & YARI:)5 LS S5.000.00 1,00 - 1-14 THERMOfat,ASlqC18"STOPBARS'ripE1 LF $12.a0 27.00 e 1-15 THERMCPLASTIC[~RECTIONALARRO1N EA $220.00 3.00 ~ 1-16 THERMOI~ WORK (ONLY) PVMT EA T, IC0.00 1~30 1.00 4~0.00 I-1 ? TYPE P-TVV 4" WHITE NON REFLECTIVE .EA $4.00 10.00 15.C0, 60.00 ~-18 TYPE F-15W 4'WHITE REFLECTIVE E~ TB.00 10.00 5.00 30.00 i-19 'I'YPER-tlTY4"YELLOWIX;NBI,E EA $8.00 10100 ,~e8 1-20 ROADSIDE SIGN ASSEMBLY EA I440.0(3 3.00 3.00 1,3L~O.00 ~,2~ 2I' CL. 3 RCP LF $,.18.50 IN.00 270.00 i-22 3rCL. 3 RCP LF $52.50 118.00 118.00 6,196.00 1-23 38'CL. 3RCP LF $70.60 117.00 117.00 8,246.50 !-24 42" CL 3 RCP LF $96.C~ 14,00 14.00 !-25 ~ CL, 3 RCP LF $1{38,50 295.00 295.00 32,007.50 I-Z5 54" CL- 3 RCP LF $133,50 401 .ao 401.00 53.533.50 ,-27 60" CL. 3 RCP LF $171.50 18.00 18.00 3,213.0:3 '. -'-28 I:~.UG FOR 30'RCP EA $'ffi2.50 4.00 4.00 610.00 .',-29 RiM TOP (::}FEX DROP INLET & CQNST 4' F.,/i 11,400.C0 1 .~3 1.130 t ,40Q.50 i~,30 4' ,~UARE $TCRM DRAIN MANHOLE EA Sl ,900.00 1 .~ 1.00 f .g00.50 -' :-~I 10' RED CURB INLET EA $1,900.0Q 1.00 200 t~,32 12' RECCURB INLET EA $2.0130.00 t.00 1.00 ~3;3 14' REC CURB ~NL. ET EA $2,100.00 3.00 300 t-34 TRENCH SAFETY FOR ,STORM {)RAIN LF $1.10 't057.00 1,061.00 UNIT I SECTtON 2 Io:.15 12 I:~C WATER ;;IPE~ DR 14 L,c $27.00 785.00 7,B5.00 21.'~95.00 1-36 12' {:)1 WATER CL. 51 LF $49.50 :2Q.QO 20.00 ;--]7 6"' I;VC WATER PIPE 0R 14 LF ,$31.50 40.00 40.00 1.260.00 ;-:18 8' DI WATER CL. 51 LF $40.00 20.00 20.00 ;*-'19 6' I~/C WATER PIPE CL, 51 LF $29.00. 10.00 10.00 290.00 ;,,.tO {:)! FITTINGS TON $5,250.00 1.50 2.C0 · .~ 5:~5 AM 2341 COPI~LL 09/10/98 10:59 CITY.DE COPPELL ENGINEERING -~ 9?2 281 4348.--, 140.587 1~05 - .. PER~OOICAL ESTIMATE NO. _3 PERIOD: ~.~ TO, 8/'31/98 ;~RC4ECT ~NI~ANGLER CONTRACTOR 'RSEO PAVING CO ~-41 12' GATE VALVE EA $1,6CO.00 1 ,IX) 1,00 1 1-42 6" GA'rE VALVE EA $I,125.~0 1.00 1.00 1 ,'125,00 , I-,43 6' GATE VALVE EA ~i/5,0O 1,00, 1.00 1-44, FIRE HYDRNft' EA 51,8C0.~)0 1,00 'r. O0 1'800.00 I-4~ CCNNECTTO EX, SYSTEM EA S8~5.00 2.00 2,00 1,/90.00 ~ TRENCH SAFE'T'Y FOR WATER LINE LF Sl. 10 885,00 885.00 973.50 UNIT 2 SECTICN I , 1~-'1 PREPARE ROW LS S128,0CO.~O 1.00 0,50 14-2 REM EXIST CONC CURB ~q, C.~NC CURB/" LF $2.00 ~50-OO -. 11-3 REM EX CONCRETE PAVEMENT SY $4.00 11-4 REM EX CONCRETE DRIVEWAYS. VALLE SY ~ $4.00 1605.00 tl-5 REM/RELOCATE EX STREET UGH'rASEE EA: S5,00000 1,00 - 11-6 UNCLASSIFIED STREET EXCAVATION CY T,5.75 11441.00 4,071.00 23,408,25 I1.~ LIME FOR SUBGRADE STABIUZATIQN TON: $100.00 295.00 100.00 10,0C0,{;30 Jl-9 7'REmF. CONC. PVMTWIrlNTEGRALC 5~' ;2.C30 18815,00 a1'l'2~[ ~11-10 C[3NCRE'FE STREET HEADER LF $5.00 215.00 - - ~ll-11 6' REINF. CCNC DRIVEWAYS, DRIVEWAY SY $21.00 1645,00 33~00 9,045.00 ill-f2 6' TY A GRADE 1 FLEXIBLE CRUSHED ST SY $7.00 8eO.0~. 401.00 :t1-13 2"TYBHMACFGRDRNEWAYIPAVEME $Y $12.00 880,00 401,00 4,812.00 ~11-14 2'TYDHMACr-ORDRIVEVVAY&~AVEME $Y 112.00 8~0.00 40100 )ll-15 4' REINF. CONCRETE SIDEWALK& ~RRI $F $3.00 2,ul~.00 808,00 2.424.00 :~ll-le MOOULAR CONCRET'E-~LOCK RETAININ . SF T25.OO 195,00 ~'11o17 AELI EXIST MANHOLE TO GRROE EA $t~00,1313 9.00 11-~8 ADJ EXWATER VALVE BOXTOGRADE EA ~CO.CO 22,CO ~ 41-'~9 AOJF, XSAN. gEWERCLEANCUT'T'QGRA EA ,~,50.~13 2.00 - ~ll-2O ADJ EX RRE HYDRANT TO GRADE EA TB00.00 4,00 ;~1-21 RER,ACE VEHICLE DETECTOR LCC;$ LF $6.00 400.00 o 11-22 RECONSTRUCT F,X BERMS AT ENTERPRI. L,S $2,000.00 1.50 - tl-23 REb'TORE P~KWAYS & YARI:~ BLOCK S LS 140.000.0C 1.00 o 11-2al RESTORE ~ARKWAYS & YARDS HYOROM LS $5,IXX3.00 1 ~l-Z5 'r, ERP,~:~PLAST~C 18'STCP I TYPE 1 LF S1:~00 14S.00 "3-'~ 11-26 THERMOI~L41~TIC DIRECTTONALARROW EA ~r20,00 il-27 THERMCPMt3T~ WORK (CNLY) PVMT M EA 1400.00 4.00 ~1-¢'8 TYPEP-TWrWHi'rENONREFLECI'NET EA I4.00 18.00 '1-29 TYPE P-15W 4"WHIT'E_ RE;LE_t't'IVETRAF ~ ,T~.G;) 18.00 - ~o31 ROADSIDE SIGN ASSEMBLY EA ~I,,e~.CQ ~-32 16'eL 3 RCP LF $34.50 216,00 - ~/-33 21" CL. 3 RCP LF $39.00 118.Q0 - 11-34:24' CL, 3 RCP LF $71.1~0 f0~0 ~-35 2r CL. 3 RCP LF 147.00 263,00 - - H-3~ 30'CL 3RCP LF $54.50 18/'00 - - N-37 3e" CL 3 RCP LF $?5.00 eB.C0 - ,14-38 i~' CL 3 RCP LF $96.C0 40.00 40.00 3,840.00 ,1r-39 4 X 3 CONCRETE 8CX CL;LVERT LF $121.50 432.00 H-40 5 X 3 CONCRETE 5OX CULVERT LF $135,50 1298.00 - I.,..41 6 X 3 CONCRETE BOX CULVERT LF $173.50 250.00 I.-42 OCUBL; 8 X 3 CONCRR BOX CULVERT.~ LF $342.00 39.{30 5v'~ 6:55 AM 2;~,1 COPPELL 09/10/98 11:00 CITY~ COPPELL ENGINEERING -, 9?2 251 4348,~ NO. S8? ~4 ~E~ WRANGLER ~~R ~EO PA~ ~ [~7 1~ REC CURB INL~ ~ i~ ,~.~ 5-~ - ~ 1Z REC ~RB IN~ ~ $I,~.~ 5.~ - - ~U9 ~ ~ Ir ~P ~ $1~.~ t.~ ~1-~ ~UG ~-~ ~P ~ $~.~ 1.~ - fZ-51 ~UG ~ 6 X 3 ~NCR~ ~ CUL~ ~ ~.~ -.~ ~H ~ FOR ~X ~LVE~ LF ~.10 ~19.~ UN~ 2 ~C~ 2 tl~ ~ER~l~WA~STA~14 ~ ~,~.~ 1.~ ~ O ~ ~l-~ ~R ~ I~WA~R STA~ ~ ~,1~ 1.~ ~ ~R ~ I~WA~R ~A ~ LS ~,1~ 1.~ i-~ ~ER ~ 1~WA~R STA ~*~ B ~.~.~ 1.~ ~ ~ER ~ ~TWA~R ~ LS ~,~,~ 't.~ i~I ~L~R B r WA~R ~A ~ ~ ~.~ 1.~ L REM~: VN, UE OF EX'rRA WORK PERFORMED TorN. v.eu e u,n LES~ Rt'TAINAGE t'% a tess .=~=v~u5 P~,'e,,XE,V'rS ~ECOMMEND ED FOR PAYMENT lP~ROVED: rJTY ENGINEER grJJ'98 6:55 AM 2341 CCIaPELL ' '