Loading...
Villages CC 1-3-CS 920420THE NELSON CORPORATION PLANNINO · EN~IIqEtRIN~ · $~iV~YING FAX ~14) ~.Z~ April 20, 1992 Ken Griffin, P.E. City of Coppell 255 Parkway Blvd, P.O. Box ~7~ Coppell, Texas 75019 PROPOSED COTTONWOOD CI~E~K SUBDWISION Dear Ken: Enclosed for your review are a list of items I would like to discuss with you at our upcoming April 23rd meeting: Submittal dates for construction plans for city review. Do they coincide with the planning commission docket dates? ~,~,,~,,~ e ~_ 2. How many sets of construction plans for review? Do the irrigation and landscape plans need to be submitted at the same lime as the subdivision plans? ~o ~ -~ ~,.~- ~ ~ '.",,-- ~ What is the required easement widths for proposed utilities'/ ,.,... ~^ ~o ~ 5. Need a current list of fees which are applicable to this development. 6. What is the City of COl~!l..'s drainage crite~ on a SF-7 zoning? ~ ,~~ (~ 7, ~~proposed utilities in this development approved by the City of Coppell or )or both? - ~_,,, ~-,, 8. Are them any proposed plans of Coppell Road adjacent to this subdivision? 'THE NELSON CORPORATIC,.. 10. 11. 12. Are the full size city sl~andard delails r~luired to be submitted with the construction plans? ,~-,fz>; ~ ~ ~ Are soil erosion plans required? If sO, does thc city have any standards or Any general notes to be included on the plans for paving, water, sanitary, storm, landscaping, etc.? oo ~ ~ o~. ~ c.,,,.,-.~i.c-.- ~t, Any other information or requirements? -z-,/o =. s~o. ?-~-, Sincerely, THE NELSON CORPORATION Timothy J, Welch, P.E. T~/dk