Villages CC 1-3-CS 920420THE NELSON CORPORATION
PLANNINO · EN~IIqEtRIN~ · $~iV~YING
FAX ~14) ~.Z~
April 20, 1992
Ken Griffin, P.E.
City of Coppell
255 Parkway Blvd,
P.O. Box ~7~
Coppell, Texas 75019
PROPOSED COTTONWOOD CI~E~K SUBDWISION
Dear Ken:
Enclosed for your review are a list of items I would like to discuss with you at our upcoming
April 23rd meeting:
Submittal dates for construction plans for city review. Do they coincide with the
planning commission docket dates? ~,~,,~,,~ e ~_
2. How many sets of construction plans for review?
Do the irrigation and landscape plans need to be submitted at the same lime as
the subdivision plans? ~o ~ -~ ~,.~- ~ ~ '.",,-- ~
What is the required easement widths for proposed utilities'/ ,.,... ~^ ~o ~
5. Need a current list of fees which are applicable to this development.
6. What is the City of COl~!l..'s drainage crite~ on a SF-7 zoning? ~ ,~~
(~ 7, ~~proposed utilities in this development approved by the City of Coppell or
)or both? -
~_,,, ~-,, 8. Are them any proposed plans of Coppell Road adjacent to this subdivision?
'THE NELSON CORPORATIC,..
10.
11.
12.
Are the full size city sl~andard delails r~luired to be submitted with the
construction plans? ,~-,fz>; ~ ~ ~
Are soil erosion plans required?
If sO, does thc city have any standards or
Any general notes to be included on the plans for paving, water, sanitary, storm,
landscaping, etc.? oo ~ ~ o~. ~ c.,,,.,-.~i.c-.- ~t,
Any other information or requirements?
-z-,/o =. s~o. ?-~-,
Sincerely,
THE NELSON CORPORATION
Timothy J, Welch, P.E.
T~/dk