Villages of CC P5-CS 960927 -- P.O. Box 478
Coppell, Texas 75019
The City With A Beautiful Future 214-462-0022
I
I
September 27, 1996
Pat Atkins
Tipton Engineering, Inc.
6330 Belt Line Rd., Suite C
Garland, TX 75043
RE: Village at Cottonwood Creek, Section V
Development Fee Assessment
Dear Mr Atkins:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $181,610.00 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
;ienT~f,~ ~.~,~p. ~.
Assistant City Manager/City Engineer
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project: Village at Cottonwood Creek, Section V
Date: 9/27/96
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $28,800.00 $28,800.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $3,050.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $1,369.39
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $96.60
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $1,770.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $70.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $26,550.00 $26,550.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $2,950.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $2,950.00
(100% due at Issuance of Building Permit)
Park Fee $75,815.00 $75,815.00
(100% due prior to Council Approval)
Roadway Impact Fee $50,445.00 $50,445.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
$193,865.99
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $181,610.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Village at Cottonwood Creek, Section ¥
DATE: 9/27/96
Water Impact Fee:
Domestic Meter(s): 59 - 5/8 inch X 3/4 inch = 59 ESU's
Irrigation Meter(s): 2 - I inch -- 5 ESU's
-- ESU's
Fireline Meter(s): 0 N/A -- ESU's
Total #: 64 ESU's @ $450.00 ea. $28,800.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 61 Connections @ $50.00 ea. $3,050.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 59 Domestic Meter(s) @ $23.21 $1,369.39
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 2 Irrigation Meter(s) @ $48.30 $96.60
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: 59 Meter(s) @ $30.00 ea. $1,770.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $35.00 ea. $70.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU' 59 @ $450.00 ea. $26,550.00
Wastewater Tap Inspection Fee:
Total #: 59 Connections @ $50.00 ea. $2,950.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 59 Lots @ $50.00 ea. $2,950.00
(100% due prior to issuance of building permit)
Page I
DEVELOPMENT FEE WORKSHEEF
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A Single-family @ $150.00 / Lot N/A
N/A Multi-family @ $75.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A Single-family @ $350.00 / Lot N/A
N/A Multi-family @ $350.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
59 Single-family @ $1285.00 / Lot $75,815.00
N/A Multi-family @ $1285.00 / Unit N/A
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations) $50,445.00
Street Lighting Fees: Information not
Assessed for lighting in the City's right-of-way, available at this time
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees: Information not
Assessed for signage in the City's right-of-way, available at this time
(See attached fee calculations if applicable)
Construction Inspection Fees: Need submittal of
A copy of the development contract must be submitted for assessment, development contracts
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
ROADWAY IMPACT FEE CALCULA It'IONS
PROJECT: Vi//age at Cottonwood Creek, Section V
DATE: 9/27/96
ROADWAY IMPACT FEE:
Service Area * 1
Category ** Residential
Land Use ** Single-Family Detached
Building Size (Sq. Ft.) N/A
Development Units ** 59
Vehicle Miles per Development Unit ** 2.85
Fee per Vehicle Mile *** $300
IRoadway Impact Fee due = (Development Units) x I
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $50,445.00
· (Figure 2 - Roadway Impact Fee Study)
· * (Table 3 - Roadway Impact Fee Study)
· ** (Schedule 2, Page 3 - Roadway Impact Fee Study)