Loading...
Villages of CC P5-CS 960927 -- P.O. Box 478 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 I I September 27, 1996 Pat Atkins Tipton Engineering, Inc. 6330 Belt Line Rd., Suite C Garland, TX 75043 RE: Village at Cottonwood Creek, Section V Development Fee Assessment Dear Mr Atkins: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $181,610.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. ;ienT~f,~ ~.~,~p. ~. Assistant City Manager/City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Village at Cottonwood Creek, Section V Date: 9/27/96 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $28,800.00 $28,800.00 (100% due prior to Council Approval) Water Tap Inspection Fee $3,050.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $1,369.39 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $96.60 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $1,770.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $70.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $26,550.00 $26,550.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $2,950.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $2,950.00 (100% due at Issuance of Building Permit) Park Fee $75,815.00 $75,815.00 (100% due prior to Council Approval) Roadway Impact Fee $50,445.00 $50,445.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts $193,865.99 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $181,610.00 DEVELOPMENT FEE WORKSHEET PROJECT: Village at Cottonwood Creek, Section ¥ DATE: 9/27/96 Water Impact Fee: Domestic Meter(s): 59 - 5/8 inch X 3/4 inch = 59 ESU's Irrigation Meter(s): 2 - I inch -- 5 ESU's -- ESU's Fireline Meter(s): 0 N/A -- ESU's Total #: 64 ESU's @ $450.00 ea. $28,800.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 61 Connections @ $50.00 ea. $3,050.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 59 Domestic Meter(s) @ $23.21 $1,369.39 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 2 Irrigation Meter(s) @ $48.30 $96.60 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: 59 Meter(s) @ $30.00 ea. $1,770.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. $70.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 59 @ $450.00 ea. $26,550.00 Wastewater Tap Inspection Fee: Total #: 59 Connections @ $50.00 ea. $2,950.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 59 Lots @ $50.00 ea. $2,950.00 (100% due prior to issuance of building permit) Page I DEVELOPMENT FEE WORKSHEEF Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: 59 Single-family @ $1285.00 / Lot $75,815.00 N/A Multi-family @ $1285.00 / Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $50,445.00 Street Lighting Fees: Information not Assessed for lighting in the City's right-of-way, available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information not Assessed for signage in the City's right-of-way, available at this time (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULA It'IONS PROJECT: Vi//age at Cottonwood Creek, Section V DATE: 9/27/96 ROADWAY IMPACT FEE: Service Area * 1 Category ** Residential Land Use ** Single-Family Detached Building Size (Sq. Ft.) N/A Development Units ** 59 Vehicle Miles per Development Unit ** 2.85 Fee per Vehicle Mile *** $300 IRoadway Impact Fee due = (Development Units) x I (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $50,445.00 · (Figure 2 - Roadway Impact Fee Study) · * (Table 3 - Roadway Impact Fee Study) · ** (Schedule 2, Page 3 - Roadway Impact Fee Study)