Villages of CC P5-CS 960828 DEVELOPMENT FEE TABLE Project: Village at Cottonwood Creek, Section V Date: 8/28/96 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $28,800.00 $28,800.00 (100% due prior to Council Approval) Water Tap Inspection Fee $3,050.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $1,369.39 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $96.60 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) '-k $1,770.00 (100% due at Issuance of Water Irrigation/Fireline Meter Deposit .._\~1' $70.00 (100% due at Issuance of W ~vieter) Wastewater Impact Fee ~;,..~"' $26,550.00 $26,550.00 (100% due prior to Co~ Approval) Wastewater Tap Inspection,-,.-Fe~ $2,950.00 (100 % due at IssUe of Building Permit) Utility Final Inspection Fee $2,950.00 (100% du~a,"t~Issuance of Building Permit) Park Fee ~.~N,~"',~ $75,815.00 $75,815.00 (100 k~ue prior to Council Approval) I_~ee R°adwao~0%Y due prior to Council Approval) $50,445 $50,445 Street L~ht Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts $118,050.99 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $181,610.00 DEVELOPMENT FEE WORKSHEET PROJECT: Village at Cottonwood Creek, Section V DATE: 8/28/96 Water Impact Fee: Domestic Meter(s): 59 - 5/8 inch X 3/4 inch = 59 ESU's Irrigation Meter(s): 2 - 1 inch = 5 ESU's = ESU's Fireline Meter(s): 0 N/A = ESU's Total #: 64 ESU's @ $450.00 ea. $28,800.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 61 Connections @ $50.00 ea. _% $3,050.00 (Single family due prior to issuance of build~n~ermit) (All other developments due prior to issu~ of meter) (Domestic): .~,.'-~' Water Meter Fee Total #: 59 Domestic Meter(s),,_-,@-'~\~' $23.21 $1,369.39 (Single family due prior to iss~re of building permit) (All other developments duf,~p~or to issuance of meter) Water Meter Fee (Irrigation/Fireline): ~'/ Total #: 2 Irrigatio,~Meter(s) @ $48.30 $96.60 Total #: 0 Addit~ Irrigation Meter(s) @ $0.00 Total #: 0 Fir~l~"Meter(s) @ $0.00 (100% du_~r to issuance of water meters) Water Meter Deposit Fee (Don~,~): Total #:4~- Meter(s) @ $30.00 ea. $1,770.00 10~ due to water ( )% prior issuance of meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. $70.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 59 @ $450.00 ea. $26,550.00 Wastewater Tap Inspection Fee: Total #: 59 Connections @ $50.00 ea. $2,950.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 59 Lots @ $50.00 ea. $2,950.00 (100% due prior to issuance of building permit) Page I DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot ~'~- N/A N/A Multi-family @ $350.00 / Unit ~ N/A (50% paid prior to Council approval~l~j~final plat) (50% paid at issuance of building~1[~mi''~ 't) * Preliminary plat approved after October 26, ~3: 59 Single-family @ $1285.0~(~o'~' t $75,815.00 N/A Multi-family @ $1285.00/'Unit N/A (100% paid prior to .~uncil approval of final plat) Roadway Impact Fee: (See attached fee calculation;,~_~- $50,445.00 Street Lighting Fees: ~e,'~' Information not Assessed for lighting i~/~ City s right-of-way, available at this time This fee cannot be ass~sed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sis Fees: Information not Assessed for signage in the City's right-of-way, available at this time (See attached fee calculations if applicable) Construction [~spection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development con[facts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Village at Cottonwood Creek, Section V DATE: 8/28/96 ROADWAY IMPACT FEE: t%~v Service Area * t%"~x~ 1 Category ** ~6~ Residential Land Use ** Single-Family Detached Building Size (Sq. Ft.) N/A Development Units ** t,xe~''~ 59 Vehicle Miles per Development Unit ** ~' 2.85 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Unit~'~ I I(Vehicle Miles per Development Unit) x (FeeO~Vehicle Mile) = $50,445.00 I ~'~ * (Figure 2 - Roadway Impact Fee Study) ~(o? (Table ~ Roadway Impact Study) ** 3 Fee *** (Schedule 2, Page 3 - Roadway Impact Fee Study)