Loading...
Villages of CC P5-CS 941024 P.O. Box 478 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 October 24, 1994 Tipton Engineering 6330 Beltline Road Suite C Garland, Texas 75043 RE: Villat, es of Cottonwood Creek Section V Development Fee Assessment Dear Sir: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for the Villages of Cottonwood Creek Section V addition. Please make payment to the City of Coppell in the amount of $432.456.40 and forward it to Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verity payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Asst. City Manager/Dir. Public Works/City Engineer cc: Alan Johnson, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Howard Pafford, Utilities Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager CITY OF COPPELL ,--- DEVELOPMENT FEES Date: October 24, 1994 Project: Villages of Cottonwood Creek Section V TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee 37,050.00 37,050.00 (100% due prior to Council Approval) Water Tap Inspection Fee 5,700.00 49- (100% due at Issuance of Water Meter) Wastewater Impact Fee 25,650.00 25,650.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 5,700.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee 2,850.00 49- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 1,268.25 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Residential) 1,710.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) -0- 49- (100% due at Issuance of Water Meters) Irrigation Meter Deposit -0- 49- (100% due at Issuance of Water Meters) Street Sign Fee 920.97 49- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Park Fee (100% due prior to Council Approval) 73,245.00 73,245.00 Street Escrow 296,511.40 296,511.40 (100% due prior to Council Approval) Construction Inspection Fee need submittal of 49- (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $450.605.62 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $432.456.40 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL PUBLIC WORKS MEMORANDUM DATE: October 18, 1994 TO: Mike Martin, E.I.T. ~ !~/ FROM: Howard Pafford, Utilities Superintendent RE: Development Fees for Villages of Cottonwoo~eek Section V The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 57 - 5/8" x 3/4" Domestic Meter/s = 57 ESU's N/A - Irrigation Meter/s = ESU's Total 57 ESU's @ $650.00 ea = $37,050.00 100% due prior to Council approval of the final plat. Wastewater Impact 57 - 5/8" x 3/4" Domestic Meter/s = 57 ESU's Total 57 ESU's @ $450.00 ea = $ 25,650.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 57 Connections @ $100.00 each = $5,700.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 57 Connections @ $100.00 each = $ 5,700.00 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 57 lots @ $50.00/lot = $ 2,850.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 57 - 5/8" x 3/4" Domestic Meters @ 22.25 ea = $ 1,268.25 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation) N/A - Irrigation Meter/s @ $ ea = $ 100% due prior to issuance of water meter/s. Water Meter Deposit (Residential) 57 Meters ~ 530.00 ea = $ 1,710.00 100% due prior to issuance of building permit. Irrigation Meter Deposit N/A Meters @ $35.00 ea = $ 100% due prior to issuance of water meters. Note: This calculation does not include water fees for irrigation meters. Information was not available. Development Fees Page 3 Park Fee For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: Residential Lots at $150.00 each = $ Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: Residential Lots at $350.00 each = $ Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after October 26, 1993 the following assessment is determined: 57 Residential Lots within Park Zone 1 at$1,285.00 each =$ 73,245 Units (Multi-Family) at $1,285.00 each = $ 100% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Development Fees Page 4 Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Development Fees Page 5 STREET LIGHT ASSESSMENT for Villages at Cottonwood Creek Section V The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE OUANTITY EXTENDED PRICE No Parking $53.10 Speed Limit $63.54 9 571.86 Yield $58.56 1 58.56 Stop $65.12 Street Name $11.60 Stop & Street Combo $96.85 3 290.55 OTHER TOTAL $ 920.97 * Cost breakdowns may be obtained from Public Works by written request. cottony, hip Revised 1/14/94