1. The alley between lot 1 and 2, Block A should be turned back to the west to intersect
with the main street. There should be some contact with the people that currently live
on Tanbark to eliminate the alley connection currently existing to Minyard Drive. This
will create more efficient traffic control in the future, especially when the school site is
constructed to the west.
2. All easements should be shown on the face of the plat.
3 As previously stated, the street access to Coppell Road should be shifted to be more
equally divided between existing Winding Hollow and Coppell Road. The proposed
location will not allow a median opening in the future when Coppell Road is constructed.
The median opening will be provided at Winding Hollow.
4. Escrow will be required for both sections of Coppell Road.
5. The center line radius of all streets should be provided and if they are less than the
minimum required by the Subdivision Ordinance then a variance will be required.
6. Sanitary Sewer service should be provided to the lot 12 retail site.
7. The utality plans show the sewer lines down the center line of the street. They should be
offset to the right-of-way.
8. Village of Cottonwood Creek Section III plans show approximately 20 acres of off-site
drainage coming onto this site basically between lots 9 and 10 of Block B. Please
reevaluate those plans and reevaluate your drainage design to ensure that all off-site
drainage is being adequately picked up and conveyed through this site.
Village of Cottonwood ~..eek, Section V Preliminary Plat
Page 2 of 2 (Engineering Comments)
9. Village of Cottonwood Creek Section III plans show that approximately all of the area
south of the Lone Star Gas Easement drains back to the east between lots 14 and 15 of
Villages of Cottonwood Creek Section 1. Please reevaluate those plans and your
drainage design to ensure that the drainage is being adequately conveyed thorough this
site.
10. It appears as though the drainage boundary lines between the various drainage areas have
not been shown. Please make sure that the limits of all drainage areas are accurately