Loading...
Villages of CC P5-CS 940817 TIPTON ENGINEERING, INC. ENGINEERING * SURVEYING · PLANNING 3950 August 17, 1994 Mr. Ken Griff'm, P.E. CITY OF COPPELL 255 Parkway Blvd Coppell, TX 75019 RE: C-'"~ .... ~ ~~]~ ~[~~:. Dear Mr. Griffin: We calculate the water and sanitary sewer demand for the above mentioned project as follows; SANITARY SEWER FLOW: 57 lots (100 gal/person/day)(3.3 people/lot)(3.1 PO .58 MGD WATER DISTRIBUTION: Average Daily Use 57 lots (150 gal/person/day)(3.3 people/lot) .085 MGD Maximum Daily Use (2 times average) .169 MGD If you have any questions or if we can be of any further assistance, please do not hesitate to contact our office. Sincerely, RING~ INC. Richard Hovas, P.-~.. Vice President RH/ce