Villages CC 1-3-CS 860220GINN, INC.
February 20, 1986
CONSULTING ENGINEERS
Mr. Larry Bateman
Jim Sowell Company
1112 Copeland Road, $420
Arlington, TX 76011-4994
Re:
Village at Cottonwood Creek III
Final Acceptance
Dear Mr. Bateman:
A final inspection of the above referenced project has been
confirmed by representatives of Ginn, Inc., M.U.D ~1, and the
City of Coppell.
Paving and utilities have been verified and are in compliance
with the City of Coppell standard requirements. As of this
date, permits can be issued to start construction of home
building.
Commitments to the Streetscape-Landscape plan should be
addressed within the phase of home building, along with all
the offsite grading that has not been addressed as of this
time.
The one-year maintenance bonds and as-built drawings have
been received from both contractors. Maturity on the bonds
will be one year from the date of this letter (2-20-87).
Sincerely,/..~
Randy Fleming
Chief Inspector
cc: Ed Powell, City Engineer
Steve Goram, Public Works--
Dale Jackson, Building Inspector
Per Birdsall, Street Department ..~
H. Wayne Ginn, P.E.