Loading...
Villages C P4-CS 920402 Coppell, Texas 75019 ~ ~ The City With A Beautiful FutUropRE_CONSTRUCTiON PACKET 214-462-0022 DATE: 4-2-92 ATTENDANCE SHEET NAME: COMPANY: PHONE: CITY OF COPPELL PRE-CONSTRUCTION CONFERENCE DATE: 4--2-92 / ASSIGNED INSPECTOR: I. ATTENDANCE: (See Attached List ) II. PLANS FURNISHED TO: A) CITY YES ~J NO B) CONTRACTOR YES ~ NO C) C~]NER YES ~'" NO III. UTILITY COMPANIES NOTIFIED: A)TELEPHONE B) GAS c) ~T.~,CTRIC ~ D) CABLE T.V. ~ ?~.~',/MZ,~ E) OTHER IV. STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS: H I GI-~kY PERMIT YES NO RA. Ir,ROgD PERMIT YES NO STREET CUT PERI~T YES NO BORING PERMIT YES NO V. INSPECTION: A. Dg~II'.¥ INSPECTION BY ASSIGNED INSPECTOR B. g2-WER HOURS AND WEEI~ND8 (OVERTIME) TO BE PJ~D BY THE CONTRACTOR "AT OVERTIME RATFB". C. CONTRACTOR 32qD SUB-C~RS TO INSPECTOR AT I',~AST ~-B3UR (24) HOIJRS BEFORE WATER/SANITARY SEglF_,R/STORM SEWER/ PAVING CONSTRUCTION BEGIlX~. (2) VI. TESTING OF MATERIALS: /'/. DENSITIES 2. APPROVED CONCRETE BATCH DESIGN 3. CONCRETE PAVING INCLUDING CORES 4. APPROVED ASPHALT BATCH DESIGN SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR VII. STREET CLOSING REQUIRED: YES NO IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE AND FIRE DEPARTMENT SEVENTY-T~qO (72) HOURS IN ADVANCE. VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL: A. REQUIRED YES JNO B. ~ic D~.~ ~S ~ IF ~=T D~.~~ ~ ~ C~ O~ ~ ~ ~ B~I~ ~OR ~PL~ ~ B~I~, THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME. IX. AS-BUILT PLANS: CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUBMII~fING THE CORRECT "AS-BUILT" PLANS TO THE CITY. X. INFORMATION: DEVELOPER: NAME: ADDRESS: PHONE: PROJECT MANAGER: CONSULTING ENGINEER: NAME: ADDRESS: PHONE: PROJECT ENGINEER: (3)