Villages C P4-CS 920402 Coppell, Texas 75019
~ ~ The City With A Beautiful FutUropRE_CONSTRUCTiON PACKET 214-462-0022
DATE: 4-2-92
ATTENDANCE SHEET
NAME: COMPANY: PHONE:
CITY OF COPPELL
PRE-CONSTRUCTION CONFERENCE
DATE: 4--2-92
/
ASSIGNED INSPECTOR:
I. ATTENDANCE: (See Attached List )
II. PLANS FURNISHED TO: A) CITY YES ~J NO
B) CONTRACTOR YES ~ NO
C) C~]NER YES ~'" NO
III. UTILITY COMPANIES NOTIFIED:
A)TELEPHONE
B) GAS
c) ~T.~,CTRIC ~
D) CABLE T.V. ~ ?~.~',/MZ,~
E) OTHER
IV. STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS:
H I GI-~kY PERMIT YES NO
RA. Ir,ROgD PERMIT YES NO
STREET CUT PERI~T YES NO
BORING PERMIT YES NO
V. INSPECTION:
A. Dg~II'.¥ INSPECTION BY ASSIGNED INSPECTOR
B. g2-WER HOURS AND WEEI~ND8 (OVERTIME) TO
BE PJ~D BY THE CONTRACTOR "AT OVERTIME
RATFB".
C. CONTRACTOR 32qD SUB-C~RS TO
INSPECTOR AT I',~AST ~-B3UR (24) HOIJRS
BEFORE WATER/SANITARY SEglF_,R/STORM SEWER/
PAVING CONSTRUCTION BEGIlX~.
(2)
VI. TESTING OF MATERIALS:
/'/. DENSITIES 2. APPROVED CONCRETE BATCH DESIGN
3. CONCRETE PAVING INCLUDING CORES
4. APPROVED ASPHALT BATCH DESIGN
SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR
VII. STREET CLOSING REQUIRED: YES NO
IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE
AND FIRE DEPARTMENT SEVENTY-T~qO (72) HOURS IN
ADVANCE.
VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL:
A. REQUIRED YES JNO
B. ~ic D~.~ ~S ~
IF ~=T D~.~~ ~ ~ C~ O~ ~ ~
~ B~I~ ~OR ~PL~ ~ B~I~,
THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME.
IX. AS-BUILT PLANS:
CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR
SUBMII~fING THE CORRECT "AS-BUILT" PLANS TO THE CITY.
X. INFORMATION:
DEVELOPER:
NAME:
ADDRESS:
PHONE:
PROJECT MANAGER:
CONSULTING ENGINEER:
NAME:
ADDRESS:
PHONE:
PROJECT ENGINEER:
(3)