Loading...
Villages CC 1-3-CS 860217GINN, INC. February 17, 1986 CONSULTING ENGINEERS Mr. Larry Bateman Jim Sowell Company 1112 Copeland Road, %420 Arlington, TX 76010 Re: Village at Cottonwood Creek I & IT Final Acceptance Dear Mr. Bateman: A final inspection of the above referenced project has been confirmed by representatives of Ginn, Inc., M.U.D %1, and the City of Coppell. Paving and utilities have been verified and are in compliance with the City of Coppell standard requirements. As of this date, permits can be issued to start construction of home building. Commitments to the Streetscape-Landscape plan should be addressed within the phase of home building, along with all the offsite grading that has not been addressed as of this time. The one-year maintenance bonds and as-built drawings have been received from both contractors. Maturity on the bonds will be one year from the date of this letter (2-17-87). Sincerely, Randy Fleming Chief Inspector /st / Ed Powell, City Engineer¢ Steve Goram, Public Works Dale Jackson, Building Inspector Per Birdsall, Street Department H. Wayne Ginn, P.E. 16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Pho6e 214/386-6611