Villages C P4-CS 920824 COPPELL PUBLIC WORKS
DATE: August 24, 1992
TO: Larry Davis, Construction Inspect¢~)
FROM: Rey Gonzales, Street Superintendel
RE: Follow-up Walk Through -- Villages of Coppell Phase IVB
The follow-up walk through was performed this morning and all
discrepancies were corrected except for the concrete damage on the
curb. This was repaired but the repair didn't adhere properly, so
consequently a crack has developed at the repair. Please have this
corrected and let me know when this is complete so we can give it
another quick look.
RG/bc
STWTVILL.RG