Loading...
Villages C P4-CS 920824 COPPELL PUBLIC WORKS DATE: August 24, 1992 TO: Larry Davis, Construction Inspect¢~) FROM: Rey Gonzales, Street Superintendel RE: Follow-up Walk Through -- Villages of Coppell Phase IVB The follow-up walk through was performed this morning and all discrepancies were corrected except for the concrete damage on the curb. This was repaired but the repair didn't adhere properly, so consequently a crack has developed at the repair. Please have this corrected and let me know when this is complete so we can give it another quick look. RG/bc STWTVILL.RG