Loading...
Villages CC 1-3-CS 850415WIIER & ASS*OC. IATES INC. April 15, 1985 Mr. Mark Sweeney Administrative Assistant City of Coppell P. O. Box 478 Coppell, Texas 75019 214/462-0022 RE.' W&A %83-096; VILLAGES AT COTTONWOOD CREEK, SECTIONS I AND II Coppell, Texas Dear Mr. Sweeney: Please find enclosed the materials submitted below for your review and approval on the Section I and Section II Villages at Cottonwood Creek project: 1. Plat application form. Four (4) sets of complete construction plans with final plats. e Seventeen (17) sets of final plats of the Section I and II plats. 4. Receipt indicating all taxes have been paid. Check for plat filinG fee in the amount of $8,497.00 ($500 plus $20 for 68 residential lots, plus multi-family ($100.00 plus $3.00 per unit): MF-1, 461 units at $3.00 per unit, in the amount of $1,383.00. MF-2, 1,718 units at $3.00 per unit, in the amount of $5,154.00. Mr. Mark Sweeney W&A %83-096 ·age 2 =of 2 6. Three (3) copies of flood study for Cottonwood Creek for request of-Letter of Belief from the Federal Emergency Management Agency (FEMA). 7. Draft letter for submittal by City's Engineer to the Federal Emergency Management Agency (FEMA) for Letter of Belief. The proposed pr6ject will include reclaiming the flood fringe adjacent to Cottonwood Creek and filling a small portion of the flood fringe adjacent to Denton Creek. The enclosed flood study on Cottonwood Creek was requested by Mr. Bill Kuno of FEMA. A letter is attached-from Mr. Kuno, dated February 26, 1985, requesting the flood study. Two copies of the flood study should be forwarded to FEMA by the City's Engineer for processing a Letter of Belief. Copies of the proposed water, sewer and drainage improvement plans have been submitted to Pierce-Lunsford & Associates for review since the improvement will be installed within the Coppell Municipal Utility District No. 1. These plans and plats are submitted at this time in order for the plat to be reviewed by the Planning & Zoning Commission on May 14, 1985. Please confirm the date the plat will be reviewed by the Planning & Zoning Commission. Please contact me if you have any questions or need additional information. Very truly yours, UL¥S III, P.E. UL:ga Enclosures: One (1) plat application form Four (4) sets of construction plans Fifteen (15) sets of final plats Three (3) sets of flood study Receipt for paid taxes Filing fees check Draft letter-requesting Letter of Belief Copy of letter from Bill Kuno cc: Mr. Tony Del Balzo / The Jim Sowell Company Mr. Jay Walker / JLB Construction Company Kent Conine / The Staubach Company Dick Pierce, P.E. / Pierce-Lunsford, w/2 sets of plans