Villages CC 1-3-CS 850415WIIER & ASS*OC. IATES INC.
April 15, 1985
Mr. Mark Sweeney
Administrative Assistant
City of Coppell
P. O. Box 478
Coppell, Texas 75019
214/462-0022
RE.'
W&A %83-096; VILLAGES AT
COTTONWOOD CREEK,
SECTIONS I AND II
Coppell, Texas
Dear Mr. Sweeney:
Please find enclosed the materials submitted below for your
review and approval on the Section I and Section II Villages at
Cottonwood Creek project:
1. Plat application form.
Four (4) sets of complete construction plans with final
plats.
e
Seventeen (17) sets of final plats of the Section I and
II plats.
4. Receipt indicating all taxes have been paid.
Check for plat filinG fee in the amount of $8,497.00
($500 plus $20 for 68 residential lots, plus
multi-family ($100.00 plus $3.00 per unit):
MF-1, 461 units at $3.00 per unit, in the amount of
$1,383.00.
MF-2, 1,718 units at $3.00 per unit, in the amount
of $5,154.00.
Mr. Mark Sweeney
W&A %83-096
·age 2 =of 2
6. Three (3) copies of flood study for Cottonwood Creek for
request of-Letter of Belief from the Federal Emergency
Management Agency (FEMA).
7. Draft letter for submittal by City's Engineer to the
Federal Emergency Management Agency (FEMA) for Letter of
Belief.
The proposed pr6ject will include reclaiming the flood fringe
adjacent to Cottonwood Creek and filling a small portion of the
flood fringe adjacent to Denton Creek. The enclosed flood study
on Cottonwood Creek was requested by Mr. Bill Kuno of FEMA. A
letter is attached-from Mr. Kuno, dated February 26, 1985,
requesting the flood study. Two copies of the flood study should
be forwarded to FEMA by the City's Engineer for processing a
Letter of Belief.
Copies of the proposed water, sewer and drainage improvement
plans have been submitted to Pierce-Lunsford & Associates for
review since the improvement will be installed within the Coppell
Municipal Utility District No. 1.
These plans and plats are submitted at this time in order for
the plat to be reviewed by the Planning & Zoning Commission on
May 14, 1985. Please confirm the date the plat will be reviewed
by the Planning & Zoning Commission.
Please contact me if you have any questions or need
additional information.
Very truly yours,
UL¥S III, P.E.
UL:ga
Enclosures: One (1) plat application form
Four (4) sets of construction plans
Fifteen (15) sets of final plats
Three (3) sets of flood study
Receipt for paid taxes
Filing fees check
Draft letter-requesting Letter of Belief
Copy of letter from Bill Kuno
cc:
Mr. Tony Del Balzo / The Jim Sowell Company
Mr. Jay Walker / JLB Construction Company
Kent Conine / The Staubach Company
Dick Pierce, P.E. / Pierce-Lunsford, w/2 sets of plans