Freeport NIP(7.6)-LR011030
GEOTECHNICAL AND I~i R I-1 I I p ENVIRONMENTAL CONSULTANTS REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 62 5495 Belt Line Road, Suite 360 REPORT DATE: 10-30-01 Dallas, Texas 75240 REG PROJECT NO. 7623 ATTN: Mr. Jeff Langston TECHNICIAN: C. McEntee PAGE: 1 of 3 CONTRACTOR: McMahon Contracting Walls Required Depth to Total Depth Actual Shaft Size Penetration Stratum of Pier Penetration Pier No. (inches) (feet) (feet) (feet) (feet) 10-08-01 1 18 30 10,4 10.4 8.9 2 12 24 15.0 15.1 13.6 3 12 24 11.0 11.8 10.3 4 12 24 11.0 11.0 9.5 5 18 30 10.9 10.9 9.4 6 12 24 10.6 10.6 9.1 7 12 24 10.7 10.9 9.4 8 18 30 11.0 11.0 9.5 9 12 24 11.5 11.5 10.0 10 12 24 11.4 11.4 9.9 11 18 30 10.9 11.0 9.5 12 12 24 10.8 11.0 9.5 18 12 30 10.8 10.8 9.3 19 12 24 10,9 11.0 9.5 20 12 24 10.8 10.8 9.3 21 i2 30 10.5 10.6 9.1 22 12 24 10.7 10.8 9.3 23 12 24 11,6 11.6 10.1 24 18 30 11.0 11.0 9.5 25 12 24 10.6 10.6 9.1 26 12 24 10.7 10.7 9.2 27 18 24 11.6 11.8 10.3 10-09-01 28 12 24 10.8 10.9 9.4 29 12 24 11.2 11.2 9.7 30 18 30 11.3 11.3 9.8 2424 STUTZ DR, · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · ~^X [214] 350 0019 REPORT NO. 62 REPORT DATE: 10-30-01 REG PROJECT NO. 7623 PAGE: 2 of 3 Screen Walls Required Depth to Total Depth Actual Shaft Size Penetration Stratum of Pier Penetration Date Pier No. (inches) (feet) (feet) (feet) (feet) 10-09-01 31 12 24 11.8 11.8 10.3 32 12 24 10.7 10.7 9.2 33 18 30 11.0 11.0 9.5 34 12 24 10.0 10.0 8.5 35 12 24 11.0 11.0 95 36 18 30 10.7 11.7 9.2 37 12 24 10.3 10.3 8.8 38 12 24 11.0 11.0 9.5 39 18 30 10.6 10.7 9,2 40 12 24 10.3 10.3 8.8 41 12 24 9.0 9.0 7.5 42 18 30 11.0 11.0 9.5 43 12 24 10.6 10.6 9.1 44 12 24 9.5 9.5 8.0 45 18 30 10.8 10.8 9.3 46 12 24 10.0 10.0 8.5 47 12 24 9.7 9.7 8.2 48 18 30 11.0 11.0 9.5 49 12 24 9.7 9.7 8.2 50 12 24 9.5 9.5 8.0 10-09-01 155 12 24 11.0 11.0 9.5 154 12 24 11.2 11.2 9.7 151 12 24 10.0 10.0 8.5 149 12 24 9.9 10.0 8.5 148 12 24 9.5 9.7 8.2 146 12 24 9.0 9.1 7.6 145 12 24 9.6 9.7 8.2 10-12-01 1 18 30 10.0 10.5 9.4 7 18 30 9.6 10.3 9.0 10 18 30 9.3 9.6 9.1 13 18 30 8.6 9.0 8.1 16 18 30 8.6 9.2 8.2 17 18 30 8.6 8.9 7.7 20 18 30 8.8 9.3 8.3 23 18 30 10.0 10.0 9.2 32 18 30 9.2 9.2 8.4 36 18 30 8.9 9.0 8.7 39 18 30 10.0 10.0 9.7 14 12 24 12.0 11.8 11.0 15 12 24 10.6 10.4 9.9 19 12 24 10.0 9.8 9.2 24 12 24 9.5 9.0 8.3 25 12 24 9.3 9.1 8.5 27 12 24 8.8 8.5 7.9 REPORT NO. 62 REPORT DATE: 10-30-01 REG PROJECT NO. 7623 PAGE: 3 of 3 Screen Walls Required Depth to Total Depth Actual Shaft Size Penetration Stratum of Pier Penetration Date Pier No. (inches) (feet) (feet) (feet) (feet) 10-12-01 28 12 24 7.5 7.2 69 30 12 24 8.0 7.9 7.7 31 12 24 8.0 8.0 7.8 34 12 24 8.6 8.2 7.7 35 12 24 8.9 8.8 8.6 37 12 24 8.7 8.3 8.0 38 12 24 9.5 9.0 8.9 40 12 24 8.4 8.5 8.4 41 12 24 7.6 7.6 7.3 10-16-01 100 12 24 9.6 9.6 8.1 101 12 24 9.4 9.4 7.9 103 12 24 8.6 8.8 7.3 106 12 24 8.0 8.3 6.8 107 12 24 8.6 8.7 7.2 109 12 24 8.2 8.2 6.7 110 12 24 8.9 8.9 7.4 112 12 24 9.0 9.2 7.7 113 12 24 9.8 9.9 8.4 115 12 24 8.0 9.0 7.5 86 12 24 11.7 11.4 9.9 85 12 24 12.1 11.8 10.3 83 12 24 13.0 12.6 11.0 82 12 24 12.3 12.0 10.5 80 12 24 11.6 11.5 10.0 79 12 24 11.7 11.8 10.3 77 12 24 11.7 11.6 10.1 76 12 24 13.0 13.0 11.5 74 12 24 12.2 12.3 10.8 73 12 24 11.2 11.2 9.7 87 12 30 12.1 12.4 10.9 84 12 30 12.7 12.7 11.2 81 12 30 12.2 12.6 11.1 78 12 30 11.0 11.0 9.5 75 12 30 12.0 12.0 10.5 114 18 30 7.8 7.9 6.4 111 18 30 8.9 8.9 7.4 108 18 30 8.7 8.8 7.3 105 18 30 8.5 8.5 7.0 102 18 30 7.8 8.2 6.7 Note: Location of piers are shown on Plate 1. Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) McMahon Contracting/ Mr. Bruce Roebuck Original Signed By (1) City of Coppell/Mr. Larry Davis (1) Metroplex Excavation, Inc. James F. Phipps, P.E. BW/mm