Loading...
Coppell Industrial-LR010504 POST INJECTION CONFIRMATION RESULTS TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial. Ltd. REPORT NO. 36 c/o Champion Partners. Ltd. REPORT DATE: 05-04-01 15601 Dallas Parkway. Suite 1::)0 REG PROJECT NO. 739/ Addison. Texas 75001 PAGE: 1 of · ATTN' Mr. Kerry Burden CONTRACTOR: C,D. Henderson, h'c. AREA REPRESENTED: Building pad -'rom rows A to G, between lines !7 to 25. Boring Number/Pocket Pen Date ! Depth I 3 0- 4.5 2.8 2.3 ~ 7 1.8 3.5 2.7 2.5 i 4.5- 6.0 4.5+ 2 3 2.0 2.0 4.0 ~ ? 3 8 6.0- 7.5 4 5+ 4.5++ 4.3 4 5+ 4.5++ 2.5 4 3 7 5 - 9.0 4.5~- 3 70 4 5+ 4.5+ 4.5++ 4.5+ 4.5+ 9.0 - 10.0 4.5.- 4.5+ 4.5+ 4.5+ 4.5+- 0 00 4 3 Boring Number/Pocket Pen Date Depth Sampled (feeb W-8 W-9 W-10 ~.5- 3.0 2 0 2.5 2.6 3.0- 4.5 2.2 2.2 2.5 4.5- 6 0 4.5++ 1 7 4.5- 6.0- ~ 5 4.5++ 4 0 2.7 7 5 - 9.0 4 5++ 3.5 4.5+ 9.0 - ~.0 0 4.++ 3 7 3.5 Comments: Borings obtained after three injection oasses. Based on the test resu':s, a'~ additional pass was not considered necessary Mail Submitted by: Distribution: ,1: Cqa"np:on Par:.ne-s Ltc.:Mr. Kerry B~rden ,1: C.D.Henderscn. I% :M'. Jason Nu~ley REED ENGINEERING GROUP. INC. ~1 ~ AECC Inc/Mr. Fran Carter ,1 ~ Me "hardt & Qu -tana~ 3-; -~1 s ~ned B; Mr Dav-c Mein¢a'o: : ' ~ Haynes Whayiey Assoc~a:es Pc.- James F. Phiops. P.E Mr. Kent Penrcd BW/cg , ': Cty o~ Coppell'Mr La'-y Da,,is , I: Cty o~ Ccppell Mr Lee Stone '---