Loading...
Coppell Industrial-LR010423 REPORT OF WATER INJECTION OBSERVATION TradePoint One Bethel Road and Royal Lane Coppell? Texas REPORTED TO: CP-Coppeil Irdustria;. Ltc. REPORT NO. 36 c/o Champior Partners. Lt¢. REPORT DATE: ..4-z3-. 15601 Daqas Pa'kway. Su,'.e 1C0 REG PROJECT NO. ¥394 Addison. Texas 75C01 TECHNICIANS: K. Blay,ock & ATTN: Mr. Kerry Burden C. Johqscq PAGE: ! cf 1 On these dates a representative of Reed Eqg'neering GrOL;~. IPc. observed water iqjectio'~ cperations on the -eferenced prc?ct. The iq?chon operations oroceeded ~q acco'oaf, ce w;tl- project soecifications unless otherw se noted. Specification Injection Depth I Injection Spacing I Injection Pressure Injection Intervals (ft) (ft) (psi) (in) Equipment Number of Number of Probes Length of Probes ! Probe Spacing Rigs (ea) (ft) i (ft) 45 4 '25 5 Date Area Injected (sq ft) Average Pressure (psil Pass No. ~,~-~ ~-~ 1~.8C0 ' - · C"-22-C, 1 39.203 15C 36 ~0C 15C 2~a. 3re Surfactant added at regular intervals: Yes Mail SJbm':ted by: Distribution: :~, Chan-o~o:' Part-ers L'.o M' Ker'y Bu'de- REED ENGINEERING GROUP, INC. 1, C D Hence'son. ':vl- Jaso~ Nun ey c-i.~--_= s ?ed B, ·1 ~ AECC Inc.'Mr Fra~ Car.e; ,1 Mei~he,dt & Q.inta~a James F. Phiops. P.E M . Da~d M= h:..d. ,1:Haynes Whayley Assoc~a:es I M-. Kent Penrcd ,1.C tj o" Cocpell:Mr Lar':~ Davis ~l - C ty o' Cocpell M' Lee Sto"e REPORT OF WATER INJECTION OBSERVATION TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial. Ltd. REPORT NO. 35 c/o Chamo~.on Partners. Ltd. REPORT DATE: 0~-23-01 15601 Dallas Parkway Suite 100 REG PROJECT NO. 739,' Addison. Texas 75001 TECHNICIAN: C Johqscr~ ATTN: Mr. Kerry B J-den PAGE: 1 of 1 On these aates a representat:ve of Reed Engineering Group Inc. observed water m. ection operations on the referenced o-oject. The injection ope-at,ons prcceeded in accordar'ce with p-oject specifications unless otqe'¥,'ise noted. Specification Injection Depth i Injection Spacing Injection Pressure Injection Intervals (ft) I (ft) (psi) (in) 10 5 '03-230 12-'8 Equipment Number of Number of Probes Length of Probes Probe Spacing Rigs (ea) (ft) (ft) 4 4 125 5 Date~! Area Injected (sq ft) Average Pressure (psi) Pass No. 03-27-3' 55 200 150 03-2~-3' ~5 CO0 150 I & 2 v3-~=-~. 55 230 C3-30-01 4~.030 ' 50 2 Surfactant added at regular intervals: Yes Mail Submitted by: Distribution: ,,1 ~ Champior' Partners. Ltd./ Mr Kerry Burden REED ENGINEERING GROUP. INC. ¢1i C D Henderson. Inc./ Mr Jason Nun.ey c.-_~-~ s ;~e: 5, (1) AECC. Inc./Mr. Fran Carter ("~ Memhardt & QJ,ntana/ James F. PhipDs. P.E Mr. David Meinhardt BW/myw ..'i ) Haynes Whayley Associates Inc./ Mr. Kent Penrod (1 ~ City of Coppell/Mr. Larry Davis ~ 1 ~ City o~ CoppelJM-. Lee Stone