Coppell Industrial-LR010423 REPORT OF WATER INJECTION OBSERVATION
TradePoint One
Bethel Road and Royal Lane
Coppell? Texas
REPORTED TO: CP-Coppeil Irdustria;. Ltc. REPORT NO. 36
c/o Champior Partners. Lt¢. REPORT DATE: ..4-z3-.
15601 Daqas Pa'kway. Su,'.e 1C0 REG PROJECT NO. ¥394
Addison. Texas 75C01 TECHNICIANS: K. Blay,ock &
ATTN: Mr. Kerry Burden C. Johqscq
PAGE: ! cf 1
On these dates a representative of Reed Eqg'neering GrOL;~. IPc. observed water iqjectio'~
cperations on the -eferenced prc?ct. The iq?chon operations oroceeded ~q acco'oaf, ce
w;tl- project soecifications unless otherw se noted.
Specification
Injection Depth I Injection Spacing I Injection Pressure Injection Intervals
(ft) (ft) (psi) (in)
Equipment
Number of Number of Probes Length of Probes ! Probe Spacing
Rigs (ea) (ft) i (ft)
45 4 '25 5
Date Area Injected (sq ft) Average Pressure (psil Pass No.
~,~-~ ~-~ 1~.8C0 ' - ·
C"-22-C, 1 39.203 15C
36 ~0C 15C 2~a. 3re
Surfactant added at regular intervals: Yes
Mail SJbm':ted by:
Distribution: :~, Chan-o~o:' Part-ers L'.o
M' Ker'y Bu'de- REED ENGINEERING GROUP, INC.
1, C D Hence'son.
':vl- Jaso~ Nun ey c-i.~--_= s ?ed B,
·1 ~ AECC Inc.'Mr Fra~ Car.e;
,1 Mei~he,dt & Q.inta~a James F. Phiops. P.E
M . Da~d M= h:..d.
,1:Haynes Whayley Assoc~a:es I
M-. Kent Penrcd
,1.C tj o" Cocpell:Mr Lar':~ Davis
~l - C ty o' Cocpell M' Lee Sto"e
REPORT OF WATER INJECTION OBSERVATION
TradePoint One
Bethel Road and Royal Lane
Coppell, Texas
REPORTED TO: CP-Coppell Industrial. Ltd. REPORT NO. 35
c/o Chamo~.on Partners. Ltd. REPORT DATE: 0~-23-01
15601 Dallas Parkway Suite 100 REG PROJECT NO. 739,'
Addison. Texas 75001 TECHNICIAN: C Johqscr~
ATTN: Mr. Kerry B J-den PAGE: 1 of 1
On these aates a representat:ve of Reed Engineering Group Inc. observed water m. ection
operations on the referenced o-oject. The injection ope-at,ons prcceeded in accordar'ce
with p-oject specifications unless otqe'¥,'ise noted.
Specification
Injection Depth i Injection Spacing Injection Pressure Injection Intervals
(ft) I (ft) (psi) (in)
10 5 '03-230 12-'8
Equipment
Number of Number of Probes Length of Probes Probe Spacing
Rigs (ea) (ft) (ft)
4 4 125 5
Date~! Area Injected (sq ft) Average Pressure (psi) Pass No.
03-27-3' 55 200 150
03-2~-3' ~5 CO0 150 I & 2
v3-~=-~. 55 230
C3-30-01 4~.030 ' 50 2
Surfactant added at regular intervals: Yes
Mail Submitted by:
Distribution: ,,1 ~ Champior' Partners. Ltd./
Mr Kerry Burden REED ENGINEERING GROUP. INC.
¢1i C D Henderson. Inc./
Mr Jason Nun.ey c.-_~-~ s ;~e: 5,
(1) AECC. Inc./Mr. Fran Carter
("~ Memhardt & QJ,ntana/ James F. PhipDs. P.E
Mr. David Meinhardt BW/myw
..'i ) Haynes Whayley Associates Inc./
Mr. Kent Penrod
(1 ~ City of Coppell/Mr. Larry Davis
~ 1 ~ City o~ CoppelJM-. Lee Stone