Loading...
Vista Properties-CS 96120203 The City With A Beautiful Future David Carleton Dowdey, Anderson and Associates 16250 Dallas Parkway, Suite 100 Dallas, TX 75248 -2684 RE: Vista Properties, Water & Sewer relocations Dear David, P.O. Box 478 Coppell, Texas 75019 214 - 462 -0022 December 2, 1996 The City of Coppell Engineering Department has completed a walk through of the referenced project. Listed below are items that must be addressed prior to final acceptance. 1. Sanitary sewer line 'A', Station 4 +32 tighten bottom band on chimney seal. 2. Sanitary sewer line 'A', Station 9 +32 tighten bottom band on chimney seal. 3. Sanitary sewer line 'A', Station 10 +01 tighten bottom band on chimney seal. 4. Reseed south side of levee. 5. Sanitary sewer line 'D', Station 0 +00 compact soil around manhole. 6. Sanitary sewer line 'D', Station 5 +00 compact soil around manhole. 7. Sanitary sewer line 'D', Station 10 +00 compact soil around manhole. 8. Sanitary sewer line 'D', Station 10 +66 compact soil around manhole and tighten bottom band on chimney seal. 9. Sanitary sewer line 'E', Station 4 +15 install chimney seal and rainpan. 10. Sanitary sewer line 'F', Station 2 +55 install rainpan 11. Sanitary sewer line 'F', Station 5 +7 install rain pan. 12. Repair leak on east side of Denton Tap, south of S.H. 121 Bypass. 13. Paint appropriate lettering on curb at valves, manholes, etc. 14. Properly insulate air release valve. 15. Following repair of the leak noted in item #12, the fire hydrant and valves along the south side of Spur 553 must be checked. 16. Deficiencies on the existing water and sewer lines must be addressed. Please notify this office prior to beginning these repairs, so that we may have an inspector present. Thank you, i a . Camp e Construction Inspector cc: J.F. Clack Inc. Mike Martin, Asst. City Engineer Matt Cast. Supt. of Public Services