Freeport NIP(7.3)-LR010911 REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Freeport VII
Royal Lane, North of Bethel Road
Coppell, Texas
REPORTED TO: Duke-Weeks Realty Corporation
5495 Belt Line Road, Suite 360
Dallas, Texas 75240
ATTN: Mr. Jeff Langston
CONTRACTOR: Raymond Construction
REPORT NO. 140
REPORT DATE: 09-11-01
REG PROJECT NO. 7570
DATE OBSERVED: 08-30-01
TECHNICIAN: T. Pickens
PAGE: 1 of 1
L Items Observed:
Approach at Creekview Drive.
L Reference Plans or Notes Used: J Sheet C5.1
xL_LJThere were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail
Distribution:
(1) Duke-Weeks Realty Corporation/
Mr. Jeff Langston
(1) Raymond Construction/
Mr. Dave Schlimme
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) HBC Engineering/Mr. Bob Baker
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
BW/cg