ST9601-CS 980505 (2) TEAGUE NALL AND PERKINS
C 0 N S U L T ~ N G E N G ! N E E R S
May 05, 1998
Mr. Michael A. Martin, E.I.T.
City of Coppell
Engineering Department
P.O. Box 478
Coppell, Texas 75019
Re: Wrangler Drive Reconstruction Project (Project No. ST 96-01)
CISD Driveway ImprovemenLo, at Approxhnateiy Sta. 20+ 30
Dear Michael:
Per our recent discussions, we have revised the breakdown of work quantities for the proposed
driveway improvements referenced above by adding items for lime stabilization of the subgrade
under the driveway improvements, lime for subgrade stabilization and restoration of parkways
& yards. The following reflects the revised breakdown of work quantities:
CISD's SHARE OF IMPROVEMENTS:
1. Remove Existing Concrete Curb 67 L.F.
2. Remove Existing Concrete Driveway 181 S.Y.
3. Lime Stabilized Subgrade 272 S.Y.
4. Lime For Subgrade Stabilization 4 Tons
5. 6" Reinforced Concrete Driveway 248 S.Y.
6. Stop Bar 25 L.F.
7. Directional Arrow Pavement Marking 5 Each
8. Word "ONLY" Pavement Marking 2 E~ch
9. Type P-7W Traffic Buttons 6 Each
10. Type P-15W Traffic Buttons 6 Each
11. Type P-117Y Traffic Buttons 16 Each
12. Roadside Sign Assembly 3 Each
13. Restore Parkways &Yards - Block Sod 100 S.Y.
CITY's SHARE OF IMPROVEMENTS:
1. .Remove Existing Concrete Driveway 152 S.Y.
2. Lime Stabilized Subgrade 238 S.Y.
3. Lime For Subgrade Stabilization 3.6 Tons
4. 6" Reinforced Concrete Driveway 217 S.Y.
5. Restore Parkways &Yards - Block Sod 110 S.Y.
2001 W. IRVING BLVD.
915 FLORENCE STREET IRVING, TEXAS 75061
FORT WORTH, TEXAS 76102 (972) 254-1765
(817) 336-5773 METRO (972) 251-1627
FAX (817) 336-2813 FAX (972) 251-4348
Mr. Michael Martin, E.I.T. - City of Coppell
Wrangler Drive Project
May 05, 1998
Page 2
Should you have any questions, please do not hesitate to give me a call.
Sincerely,
/ND PERKINS, INC.
Michael A. Jones, P~
xc: Mr. Mickey Harper, Director of Maintenance
Coppell Independem School District