Loading...
ST9601-CS 980505 (2) TEAGUE NALL AND PERKINS C 0 N S U L T ~ N G E N G ! N E E R S May 05, 1998 Mr. Michael A. Martin, E.I.T. City of Coppell Engineering Department P.O. Box 478 Coppell, Texas 75019 Re: Wrangler Drive Reconstruction Project (Project No. ST 96-01) CISD Driveway ImprovemenLo, at Approxhnateiy Sta. 20+ 30 Dear Michael: Per our recent discussions, we have revised the breakdown of work quantities for the proposed driveway improvements referenced above by adding items for lime stabilization of the subgrade under the driveway improvements, lime for subgrade stabilization and restoration of parkways & yards. The following reflects the revised breakdown of work quantities: CISD's SHARE OF IMPROVEMENTS: 1. Remove Existing Concrete Curb 67 L.F. 2. Remove Existing Concrete Driveway 181 S.Y. 3. Lime Stabilized Subgrade 272 S.Y. 4. Lime For Subgrade Stabilization 4 Tons 5. 6" Reinforced Concrete Driveway 248 S.Y. 6. Stop Bar 25 L.F. 7. Directional Arrow Pavement Marking 5 Each 8. Word "ONLY" Pavement Marking 2 E~ch 9. Type P-7W Traffic Buttons 6 Each 10. Type P-15W Traffic Buttons 6 Each 11. Type P-117Y Traffic Buttons 16 Each 12. Roadside Sign Assembly 3 Each 13. Restore Parkways &Yards - Block Sod 100 S.Y. CITY's SHARE OF IMPROVEMENTS: 1. .Remove Existing Concrete Driveway 152 S.Y. 2. Lime Stabilized Subgrade 238 S.Y. 3. Lime For Subgrade Stabilization 3.6 Tons 4. 6" Reinforced Concrete Driveway 217 S.Y. 5. Restore Parkways &Yards - Block Sod 110 S.Y. 2001 W. IRVING BLVD. 915 FLORENCE STREET IRVING, TEXAS 75061 FORT WORTH, TEXAS 76102 (972) 254-1765 (817) 336-5773 METRO (972) 251-1627 FAX (817) 336-2813 FAX (972) 251-4348 Mr. Michael Martin, E.I.T. - City of Coppell Wrangler Drive Project May 05, 1998 Page 2 Should you have any questions, please do not hesitate to give me a call. Sincerely, /ND PERKINS, INC. Michael A. Jones, P~ xc: Mr. Mickey Harper, Director of Maintenance Coppell Independem School District