Loading...
Freeport NIP(7.3)-LR010727GEOTECHNICAL AND ~ R I--'i ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston REPORT NO. 136 REG PROJECT NO. 7570 SAMPLE DATE: 07-27-01 TECHNICIAN: R. Yeoman CONTRACTOR: Raymond Construction Location of Sample Set Number I Location I Quantity Represented 1 Paving: 20'S, 10'E of N.E. building corner 40/550 2 Paving: 80'S, 10'E of N.E. building corner 170/550 3 Paving: 120'S, 30'E of N.E. building corner 230/550 4 Paving: 25'S, 75'E of S.W. building corner 330/550 5 Paving: 50'S, 45'E of S.W. building corner 440/550 6 Paving: 75'N, 50'W of N.E. building corner 500/550 Design Information Source of Concrete I Mix Identification Potter 7752 Specified Strength p.s.i. 4OOO Test Results Set Cylinder No. ID Date Tested 1 1164 08-03-01 1164 08-24-01 1164 08-24-01 1164 Hold Age @ Total Load Test lbs. Compressive I Average Strength p.s.i. Strength p.s.i. 7 105180 3720 28 128620 4550 28 132960 4710 H 2 1165 08-03-01 7 87060 3080 1165 08-24-01 28 127850 4530 1165 08-24-01 28 131310 4650 1165 Hold H 3 1166 08-03-01 7 87610 3100 1166 08-24-01 28 125490 4440 1166 08-24-01 28 128520 4550 1166 Hold H 4 1167 08-03-01 7 78360 2770 1167 08-24-01 28 105590 3740 1167 08-24-01 28 107180 3790 1167 09-21-01 56 126660 4480 463O 459O 450O 3770 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Set CylinderI I Age@ No. ID Date Tested Test 5 1168 08-03-01 7 1168 08-24-01 28 1168 08-24-01 28 1168 09-21-01 56 1169 08-03-01 7 1169 08-24-01 28 1169 08-24-01 28 1169 Hold H ITotalLoad [ CompressiveI Average lbs. Strength p.s.i. Strength p.s.i. 80240 2840 108860 3850 108940 3860 114790 4060 88490 3130 111560 3950 117770 4170 3860 4O6O Cylinder Data Set Cylinder I No. ID Slump 1 1164 5,00 2 1165 5.50 3 1166 5.00 4 1167 5.00 5 1168 4.50 6 1169 4.00 Time of i IConcrete Air I Ticket Sample AirTemp. Temp. Entrainment Number 5:25AM 88 92 4.7 613302 7:40AM 90 89 4.9 613395 8:50AM 92 89 5.2 613401 10:00AM 86 86 5.8 613411 12:00PM 91 86 5.8 613422 2:30PM 97 90 5.6 613428 Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) HBC Engineering/Mr. Bob Baker Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je