Loading...
Freeport NIP(7.3)-LR010628 GEOTECHNICALAND I ~ ~ r-'l I I ~ , ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston REPORT NO. 125 REG PROJECT NO. 7570 SAMPLE DATE: 06-28-01 TECHNICIAN: E. Beacham CONTRACTOR: Raymond Construction Location of Sample Set Number I Location Paving: 275'S, 50'W of N.W. building corner Paving: 205'S, 30'W of N.W. building corner Paving: 50'S, 50'W of N.W. building corner Paving: 160'S, 35'W of N.W. building corner Paving: 500'S, 60'W of N.W. building corner Paving: 150'E, 20'S of S.W. building corner Quantity Represented 30/560 13O~56O 23O/56O 320/560 430/560 530/560 Design Information Source of Concrete Potter Mix Identification I Specified Strength p.s.i. 7752 3000 Test Results Set Cylinder I No. ID Date Tested Age@ Total Load I CompressiveI Average Test lbs. Strength p.s.i. Strength p.s.i. 2 9958 07-05-01 7 71220 2520 9958 07-26-01 28 96590 3420 9958 07-26-01 28 90130 3190 9958 Hold H 3 9959 07-05-01 7 99160 3510 9959 07-26-01 28 115170 4080 9959 07-26-01 28 117210 4150 9959 Hold H 4 9960 07-05-01 7 76420 2700 9960 07-26-01 28 105230 3720 9960 07-26-01 28 103240 3650 9960 Hold H 9961 07-05-01 7 97860 3460 9961 07-26-01 28 116460 4120 9961 07-26-01 28 113700 4020 9961 Hold H 3310 4120 369O 4070 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · ~AX [214] 350 0019 No. ID Date Tested Test lbs. Strength p.s.i. 5 9962 07-05-01 7 99330 3520 9962 07-26-01 28 117790 4170 9962 07-26-01 28 124340 4400 9962 Hold H 6 9963 07-05-01 7 92610 3280 9963 07-26-01 28 111490 3950 9963 07-26-01 28 109240 3870 9963 Hold H Average Strength p.s.i. 429O 3910 Cylinder Data Set Cylinder Time of I Concrete Air Ticket No. ID Slump Sample AirTemp.I Temp. Entrainment Number 1 9958 6.00 5:40AM 78 86 7.8 612449 2 9959 5.00 6:15AM 77 88 7.2 612459 3 9960 6.00 7:50AM 75 80 7.1 612469 4 9961 5.00 9:00AM 75 83 6.9 612478 5 9962 5.00 11:30AM 85 93 6.8 612508 6 9963 6.00 1:00PM 90 93 5.7 N/A Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) HBC Engineering/Mr. Bob Baker Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je