Loading...
Freeport NIP(7.3)-LR010618 GEOTECHNICAL AND J~j J==J I'-I U J== ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 113 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7570 Dallas, Texas 75240 SAMPLE DATE: 06-18-01 ATTN: Mr. Jeff Langston TECHNICIAN: R. Hollings CONTRACTOR: Raymond Construction Location of Sample Set Number J Location J Quantity Represented 1 Paving: 160'N, 5'W of S.W. building corner 10/550 2 Paving: 210'N, 25'W of S.W. building corner 110/550 3 Paving: 270'N, 55'W of S.W. building corner 210/550 4 Paving: 360'N, 65'W of S.W. building corner 310/550 5 Paving: 420'N, 10'W of S.W. building corner 410/550 6 Paving: 540'N, 40'W of S.W. building corner 510/550 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. Potter 7752 4000 Test Results Set Cylinder Age@ J TotalLoad J Compressive J Average No. ID Date Tested Test J J Jibs. Strength p.s.i. Strength p.s.i. 1 9301 06-25-01 7 108090 3830 9301 07-16-01 28 131350 4650 9301 07-16-01 28 131840 4670 4660 9301 Hold H 2 9302 06-25-01 7 106290 3760 9302 07-16-01 28 130210 4610 9302 07-16-01 28 132100 4680 4650 9302 Hold H 3 9303 06-25-01 7 89830 3180 9303 07-16-01 28 119350 4220 9303 07-16-01 28 115500 4090 4160 9303 Hold H 4 9304 06-25-01 7 89670 3170 9304 07-16-01 28 117990 4180 9304 07-16-01 28 118010 4180 4180 9304 Hold H 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 No. ID Date Tested Test I I IIbs' Strength p.s.i. Strength p.s.i. 5 9305 06-25-01 7 89140 3150 9305 07-16-01 28 119020 4210 9305 07-16-01 28 118020 4180 4200 9305 Hold H 6 9306 06-25-01 7 77570 2750 9306 07-16-01 28 113160 4010 9306 07-16-01 28 115910 4100 4060 9306 Hold H Cylinder Data Set Cylinder I Time of Concrete I Air Ticket No. ID Slump I Sample Air Temp. Temp. I Entrainment Number 1 9301 5.00 6:15AM 70 80 N/A 611851 2 9302 5.00 7:10AM 70 80 N/A 611861 3 9303 5.00 8:05AM 76 85 N/A 611871 4 9304 5.00 8:50AM 80 85 N/A 611881 5 9305 5.00 10:10AM 82 86 N/A 611891 6 9306 5.00 11:15AM 82 86 N/A 611902 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Raymond Construction/ Mr. Dave Schlimme Original Signed By (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Keith Atkins (1) HBC Engineering/Mr. Bob Baker KEA/je