Freeport NIP(7.3)-LR010529GEOTECHNICAL AND J~ R r-i I I p
ENVIRONMENTAL CONSULTANTS
REPORT OF PIER OBSERVATION
Freeport VII
Royal Lane, North of Bethel Road
Coppell, Texas
REPORTED TO:
Duke-Weeks Realty Corporation
5495 Belt Line Road, Suite 360
Dallas, Texas 75240
ATTN: Mr. Jeff Langston
CONTRACTOR: Raymond Construction
REPORT NO. 77
REPORT DATE: 05-29-01
REG PROJECT NO. 7570
TECHNICIAN: 05-11-01
PAGE: 1 of 1
I Pier Diameter I Bell Diameter Depth Before Final Depth Concrete
Date Pier No. (inches)I (inches) Bell (feet) of Pier (feet) Length (feet)
05-11-01
0.1A-2.9 24 48 14.2 14.2 10.7
0.5A-2.9 24 48 14.4 14.4 10.4
0.9A-2.9 24 48 14.7 14.8 10.8
0.1A-19.1 24 48 14.4 14.5 10.5
0.5A-19.1 24 48 14.3 14.4 10.4
0.9A-19.1 24 48 15.1 15.5 11.0
Mail
Distribution:
(1) Duke-Weeks Realty Corporation/
Mr. Jeff Langston
(1) Raymond Construction/
Mr. Dave Schlimme
(1) City of Coppell/Mr. Larry Davis
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
JFP/myw
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019