Loading...
Freeport NIP(7.3)-LR010522 GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT OF PIER OBSERVATION Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston REPORT NO. 55 REPORT DATE: 05-22-01 REG PROJECT NO. 7570 TECHNICIAN: S. Davis PAGE: 1 of 1 CONTRACTOR: Raymond Construction Pier Bell Before Final Depth Concrete Diameter Diameter Bell of Pier Length Date Pier No. (inches) (inches) (feet) (feet) (feet) 04-26-01 A-12 24 72 12.0 12.4 12.4 A-12.3 24 72 12.1 12.6 12.6 A-12.6 24 72 12.3 12.6 12.6 A-11 24 72 13.2 13.5 13.5 A-11.3 24 72 12.2 12.5 12.5 A-11.6 24 72 12.0 12.3 12.3 A-10 24 72 12.3 12.4 12.4 A-10.3 24 72 12.2 12.3 12.3 A-10.6 24 72 12.3 12.5 12.5 A-9 24 72 12.2 12.6 12.6 04-27-01 A-8.6 24 72 12.2 12.4 12.4 A-8.3 24 72 12.3 12.5 12.5 A-8 24 72 12.5 12.7 12.7 A-7.6 24 72 12.7 12.9 12.9 A-7.3 24 72 12.4 12.6 12.6 A-6 24 72 13.0 13.1 13.1 A-5.6 24 72 12.2 12.2 12.2 A-5.3 24 72 13.4 13.7 13.7 A-5 24 72 13.5 13.9 13.9 Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. KA/mm 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT OF PIER OBSERVATION Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: CONTRACTOR: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston Raymond Construction REPORT NO. 72 REPORT DATE: 05-22-01 REG PROJECT NO. 7570 TECHNICIAN: S. Davis PAGE: 1 of 1 J Pier Diameter Bell Diameter Depth Before I Final Depth Concrete Date Pier No.I (inches) (inches) Bell (feet)I of Pier (feet) Length (feet) 05-09-01 L.9-2.9 24 48 16.0 16.3 16.3 L.9-1.9 24 48 16.7 17.0 17.0 L.9-1.3 24 48 17.0 17.0 17.0 L.9-4 24 48 16.0 16.1 16.1 K.6-4 24 48 16.2 16.4 16.4 K.3-4 24 48 16.0 16.2 16.2 L-1.4 24 54 15.7 16.0 16.0 L-2.2 24 54 15.7 15.9 15.9 A-1 24 72 12.0 12.1 12.1 Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppeil/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Odginal Signed By James F. Phipps, P.E. JFP/cg 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICALAND r~ F=j r-I I I j~= ENVIRONHENTAL CONSULTANTS REPORT OF PIER OBSERVATION Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston CONTRACTOR: Raymond Construction REPORT NO. 62 REPORT DATE: 05-22-01 REG PROJECT NO. 7570 TECHNICIAN: S. Davis PAGE: 1 of 3 Date J Pier Diameter Bell DiameterI Depth Before I Final Depth Concrete Pier No. (inches) (inches) Bell (feet)I of Pier (feet) Length (feet) 04-30-01 05-01-01 A-4.3 24 72 12.3 12.4 12.4 A-4 24 72 14.2 14.2 14.2 A-3.6 24 72 13.9 14.0 14.0 A-3.3 24 72 14.0 14.4 14.4 A-3 24 72 14.0 14.0 14.0 A-6 24 72 13.1 13.3 13,3 A-6.3 24 72 13.8 13.9 13.9 A-6.6 24 72 13.3 13.8 13.8 A-2.5 24 72 15.0 15.4 15.4 A-2 24 72 14.4 14.7 14.7 A-1.5 24 72 16.8 17.0 17.0 A.3-21 24 72 12.4 12.5 12.5 L.9-21.1 24 48 16.7 16.7 16.7 M-20.3 24 72 12.6 12.4 12.4 L.9-20.3 24 48 17.6 17.6 17.6 M-19.7 24 72 12.6 12.8 12.8 L.9-19.7 24 48 17.6 17.2 17.2 L.9-19.1 24 48 16.6 16.9 16.9 A.6-21 24 72 12.6 12.4 12.4 B-21 24 72 12.6 12.5 12.5 C-21 24 72 12.6 12.4 12.4 C.5-21 24 72 13.6 13.2 13.2 D-21 24 72 12.6 12.3 12.3 D.5-21 24 72 12.2 12.2 12.2 L-12.5 24 72 13.0 13.3 13.3 L-12 24 72 12.6 12.6 12.6 L-11.3 24 72 12.0 12.4 12.4 L-11 24 72 12.3 12.7 12.7 L-10.6 24 72 12.0 12.1 12.1 2424 STUTZ DR. ,, SUITE 400., DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 REPORT NO. 62 REPORT DATE: 05-22-01 REG PROJECT NO. 7570 PAGE: 2 of 3 Date Pier No. Pier Diameter Bell Diameter Depth Before I Final Depth Concrete (inches) (inches) Bell (feet)I of Pier (feet) Length (feet 05-01-01 05-02-01 05-03-01 L-10.3 24 72 12.0 12.3 12.3 L-10 24 72 13.0 13.0 13.0 L-9.6 24 72 12.4 12.8 12.8 L-9.3 24 72 12.3 12.3 12.3 L-9 24 72 12.4 12.4 12.4 L-8.6 24 72 12.0 12.1 12.1 L-8.3 24 72 12.0 12.2 12.2 L-8 24 72 12.4 12.4 12.4 L-7.5 24 72 12.0 12.0 12.0 L-7 24 72 12.3 12.5 12.5 L-6.6 24 72 12.2 12.4 12.4 L-6.3 24 72 12.0 12.0 12.0 L-6 24 72 12.5 12.5 12.5 L-5.5 24 72 12.0 12.7 12.7 L-5 24 72 12.0 12.4 12.4 L-4.5 24 72 13.2 13.2 13.2 L-4 24 72 13.5 13.8 13.8 L-3.5 24 72 13.4 13.6 13.6 B.5-21 * 24 72 18.4 18.4 18.4 E.5-21 * 24 72 18.0 18.0 18.0 K-21 * 24 72 18.2 18.7 18.7 K.5-21 * 24 72 18.4 18.5 18.5 E.5-21 * 24 72 19.9 20.0 20.0 L-3 24 72 14.4 14.4 14.4 M-3 24 72 13.4 13.4 13.4 M-2.6 24 72 12.6 12.8 12.8 M-1.9 24 72 12.0 12.4 12.4 M-1.3 24 72 12.4 12.4 12.4 M-5 24 72 12.4 12.8 12.8 K.6-5 24 72 12.5 12.6 12.6 K.3-5 24 72 12.4 12.8 12.8 K-5 24 72 12.4 12.7 12.7 K-1 24 72 13.3 13.3 13.3 J.5-1 24 72 13.0 13.0 13.0 J-1 24 72 13.1 13.4 13.4 H.5-1 24 72 13.7 13.7 13.7 H-1 24 72 13.2 13.6 13.6 G.5-1 24 72 13.3 13.3 13.3 G-1 24 72 13.7 13.7 13.7 F,5-1 24 72 13.3 13.4 13.4 F-1 24 72 14.1 14.6 14.6 E.5-1 24 72 13.0 13.4 13.4 REPORT NO. 62 REPORT DATE: 05-22-01 REG PROJECT NO. 7570 PAGE: 3 of 3 Date Pier No. Pier Diameter Bell Diameter Depth Before (inches) (inches) Bell (feet) Final Depth Concrete of Pier (feet) Length (feet) 05-04-01 E-1 24 72 13.0 13.0 13.0 D.5-1 24 72 12.9 13.1 13.1 D-1 24 72 13.5 13.5 13.5 C.5-1 24 72 14.0 14.1 14.1 C-1 24 72 13.2 13.2 13.2 B.5-1 24 72 13.3 13.3 13.3 B-1 24 72 13.5 13.5 13.5 A.6-1 24 72 12.7 13.0 13.0 A.3-1 24 72 13.9 14.0 14.0 * Pier required use of temporary casing. Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. KA/cg