Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Freeport NIP(7.3)-LR010515
gEOTECHNICAL AND {~j J==J J~] I I p ENVIRONMENTAL CONSULTANTS REPORT OF PIER OBSERVATION Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: CONTRACTOR: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston Raymond Construction REPORT NO. 48 REPORT DATE: 05-15-01 REG PROJECT NO. 7570 TECHNICIAN: S. Davis PAGE: 1 of 2 Date I Pier Diameter Bell Diameter Depth Before I Final Depth Concrete Pier No. (inches) (inches) Bell (feet)I of Pier (feet) Length (feet) 04-16-01 04-17-01 B-3 24 60 18.0 18.5 18.5 C-3 24 54 17.0 17.1 17.1 D-3 24 54 17.0 17.4 17.4 E-3 24 54 17.6 17.8 17.8 F-3 24 54 17.7 18.0 18.0 G-3 24 54 17.3 17.5 17.5 H-3 24 54 17.4 17.6 17.6 J-3 24 54 18.4 18.7 18.7 K-3 24 60 17.6 18.0 18.0 B-4 24 60 17.8 17.8 17.8 C-4 24 54 18.2 18.8 18.8 D-4 24 54 17.8 17.8 17.8 E-4 24 54 17.8 17.8 17.8 F-4 24 54 17.5 17.5 17.5 H-4 24 54 16.8 16.9 16.9 G-4 24 54 16.7 16.7 16.7 J-4 24 54 16.5 16.5 16.5 K-4 24 60 17.1 17.3 17.3 B-5 24 60 16.7 16.8 16.8 C-5 24 54 16.2 16.2 16.2 D-5 24 54 16.2 16.2 16.2 E-5 24 54 16.7 16.7 16.7 F-5 24 54 16.1 16.3 16.3 G-5 24 54 16.2 16.4 16.4 H-5 24 54 16.4 16.7 16.7 J-5 24 54 16.2 16.2 16.2 K-5 24 60 16.4 16.8 16.8 B-6 24 60 16.3 16.5 16.5 C-6 24 54 16.2 16.5 16.5 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 REPORT NO. 48 REPORT DATE: 05-15-01 REG PROJECT NO. 7570 PAGE: 2 of 2 Date I Pier No. Pier Diameter Bell Diameter Depth Before (inches) (inches) Bell (feet) Final Depth Concrete of Pier (feet) Length (feet) 04-17-01 04-18-01 D-6 24 54 16.6 17.0 17.0 E-6 24 54 16.6 17.1 17.1 F-6 24 54 16.0 16.0 16.0 G-6 24 54 17.2 17.4 17.4 H-6 24 54 16.2 16.4 16.4 J-6 24 54 16.7 17.0 17.0 K-6 24 60 16.7 16.8 16.8 K-7 24 60 17.0 17.2 17.2 J-7 24 54 18.0 18.4 18.4 H-7 24 54 16.5 16.7 16.7 G-7 24 54 16.4 16.7 16.7 F-7 24 54 16.5 16.5 16.5 E-7 24 54 16.6 17.1 17.1 D-7 24 54 18.0 18.0 18.0 C-7 24 54 16.5 16.8 16.8 B-7 24 60 16.5 16.5 16.5 Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. KA/myw GEOTECHNICALAND ~ J:::;J I"-! I I ~ ENVIRONMENTAL CONSULTANTS REPORT OF PIER OBSERVATION Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston CONTRACTOR: Raymond Construction Date Pier No. REPORT NO. 54 REPORT DATE: 05-15-01 REG PROJECT NO. 7570 TECHNICIAN: S. Davis PAGE: 1 of 1 JPier Diameter (inches) Bell Diameter Depth Before (inches) Bell (feet) Final Depth Concrete of Pier (feet) Length (feet) 04-23-01 A-18.3 A-18.6 A-17 A-17.3 A-17.6 A-16 A-16.3 A-16.6 A-15 A-15.5 A-14 04-24-01 A-14.3 A-14.6 A-13 A-13.3 A-13.6 A-21.5 A-20 A-20.5 A-19 A-19.3 A-19.6 A-18 04-25-01 K.6-21 K.3-21 J-21 H.5-21 H-21 G.5-21 G-21 F.5-21 24 72 12.1 12.5 12.5 24 72 12.0 12.5 12.5 24 72 12.5 12.7 12.7 24 72 12.0 12.4 12.4 24 72 12.4 12.6 12.6 24 72 11.9 12.4 12.4 24 72 12.2 12.5 12.5 24 72 12.4 12.4 12.4 24 72 12.4 13.0 13.0 24 72 12.0 12.2 12.2 24 72 12.1 12.7 12.7 24 72 12.3 12.5 12.5 24 72 12.1 12.4 12.4 24 72 12.4 12.7 12.7 24 72 12.2 12.5 12.5 24 72 12.7 13.1 13.1 24 72 16.2 16.9 16.9 24 72 14.0 14.4 14.4 24 72 14.1 14.9 14.9 24 72 14.4 15.0 15.0 24 72 13.0 13.4 13.4 24 72 13.2 13.6 13.6 24 72 13.0 13.3 13.3 24 72 13.5 13.7 13.7 24 72 13.7 13.9 13.9 24 72 13.7 13.7 13.7 24 72 13,0 13.4 13.4 24 72 13.4 13.8 13.8 24 72 14.2 14.2 14.2 24 72 13.1 13.1 13.1 24 72 13.4 13.4 13.4 Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr, Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. KA/myw 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND I G F:;;J I"1 LJ F~ ENVIRONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston CONTRACTOR: Raymond Construction Location of Sample Set Number J Location 1 Floor slab at J-5 2 Floor slab at H-5 3 Floor slab at F-5.5 4 Floor slab at C-5 5 Floor slab at A-5 6 Floor slab at A.5-8 REPORT NO. 94 REG PROJECT NO. 7570 SAMPLE DATE: 05-15-01 TECHNICIAN: R. Yeoman J Quantity Represented 70/62O 160/620 240/620 350/620 460/620 58O/620 Design Information Source of Concrete Potter Mix Identification J Specified Strength p.s.i. 9349 4000 Test Results Set Cylinder J No. ID Date Tested Age @ Total Load J Compressive Average Test lbs.J Strength p.s.i. Strength p.s.i. 2 7901 05-22-01 7 116460 4120 7901 06-12-01 28 155330 5500 7901 06-12-01 28 161510 5720 7901 Hold H 3 7902 05-22-01 7 66450 2350 7902 06-12-01 28 152110 5380 7902 06-12-01 28 158930 5620 7902 Hold H 7903 05-22-01 7 105250 3720 7903 06-12-01 28 145210 5140 7903 06-12-01 28 148830 5270 7903 Hold H 7904 05-22-01 7 111360 3940 7904 06-12-01 28 149540 5290 7904 06-12-01 28 151130 5350 7904 Hold H 5610 55OO 5210 532O 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Set CylinderI No. ID Date Tested Age @ Total Load Compressive I Average Test lbs. Strength p.s.i.I Strength p.s.i. 7905 05-22-01 7905 06-12-01 7905 06-12-01 7905 Hold 7 28 28 H 112820 3990 144580 5120 148790 5270 52O0 79O6 05-22-01 7906 06-12-01 7906 06-12-01 7906 Hold 7 28 28 H 117520 4160 139930 4950 14566O 5160 5060 Cylinder Data Set No. 1 2 3 4 5 6 Cylinder I Time of ID SlumpI Sample Air Temp. 7901 4.75 5:00AM 58 7902 4.50 6:10AM 62 7903 5.00 6:50AM 63 7904 4.50 8:15AM 65 7905 4.50 9:10AM 72 7906 4.75 10:15AM 74 Concrete Air Ticket Temp. Entrainment Number 68 N/A 611005 73 N/A 611014 76 N/A 611022 75 N/A 611033 82 N/A 611O44 78 N/A 611056 Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) HBC Engineering/Mr. Bob Baker Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je GEOTECHNICALAND J ~ F=J I~1 I I ~ ENVIRONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston CONTRACTOR: Raymond Construction Location of Sample ISet Number [ Location 1 Piers: M-19, L-19, L-18,5 and L-18 REPORT NO. 93 REG PROJECT NO. 7570 SAMPLE DATE: 05-15-01 TECHNICIAN: S. Davis J Quantity Represented 10/10 Design Information Source of Concrete I Mix Identification Potter 9337 Specified Strength p.s.i. 3OOO Test Results Set Cylinder[ No. ID Date Tested 1 7668 05-22-01 7668 06-12-01 7668 06-12-01 7668 Hold Age @ Test TotalLoad lbs. 7 28 28 H 92480 125160 129100 ICompressive Average Strength p.s.i. Strength p.s.i. 327O 4430 4570 45O0 Cylinder Data Set Cylinder I Time of Concrete No. ID I Slump Sample Air Temp. Temp. i 7668 5.00 1:45PM 89 90 Air Ticket Entrainment Number N/A 611069 Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) HBC Engineering/Mr. Bob Baker Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je 2424 STUTZ DR. * SUITE 400 * DALLAS, TX 75235 * TEL [214] 350 5600 * FAX [214] 350 0019