Loading...
Freeport NIP(7.3)-LR010426 (2) GEOTECHNICAL AND J G F=J r-i U P ENVIRONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 69 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7570 Dallas, Texas 75240 SAMPLE DATE: 04-26-01 ATTN: Mr. Jeff Langston TECHNICIAN: S. Davis CONTRACTOR: Raymond Construction Location of Sample Set Number I Location I Quantity Represented 1 Piers: A-12, A-12.3, A-12, A-11 and A-11.3 10/20 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. Potter 9337 3000 Test Results Set Cylinder J Age@ Total Load I Compressive] Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 6602 05-03-01 7 96110 3400 6602 05-24-01 28 144360 5110 6602 05-24-01 28 147060 5200 5160 6602 Hold H Cylinder Data Set J Cylinder Time of J Concrete Air Ticket J No. ID Slump Sample Air Temp. Temp. Entrainment Number I i 6602 5.50 1:00PM 82 76 N/A 610660 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Raymond Construction/ Mr. Dave Schlimme Original Signed By (1) City of Coppell/Mr. Larry Davis Keith Atkins KEA/je 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 ' FAX [214] 350 0019 GEOTECHNICALAND J r~ R i'-1 I I ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 69 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7570 Dallas, Texas 75240 SAMPLE DATE: 04-26-01 ATTN: Mr. Jeff Langston TECHNICIAN: S. Davis CONTRACTOR: Raymond Construction Location of Sample Set Number I Location I Quantity Represented 1 Piers: A-12, A-12.3, A-12, A-11 and A-11.3 10/20 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. Potter 9337 3000 Test Results Set CylinderI Age@ Total Load I CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 6602 05-03-01 7 96110 3400 6602 05-24-01 28 6602 05-24-01 28 6602 Hold H Cylinder Data J Set Cylinder I Timeof I Concrete Air I Ticket No, ID Slump Sample Air Temp. Temp. Entrainment Number 1 6602 5.50 1:00PM 82 76 N/A 610660 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Raymond Construction/ Mr. Dave Schlimme Original Signed By (1) City of Coppell/Mr. Larry Davis Keith Atkins KENje 2424 STUTZ DR. · SUITE 400 * DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND ENVlRONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 68 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7570 Dallas, Texas 75240 SAMPLE DATE: 04-26-01 A-I-I-N: Mr. Jeff Langston TECHNICIAN: R. Yeoman CONTRACTOR: Raymond Construction Location of Sample Set Number I Location J Quantity Represented 1 Floor slab at A-5 60/795 2 Floor slab at C-4 160/795 3 Floor slab at C.8-4 270/795 4 Floor slab at E-5.5 360/795 5 Floor slab at E.5-6 470/925 6 Floor slab at G.6-5.5 560/795 7 Floor slab at J.8-5 640/795 8 Floor slab at L.5-6 715/795 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. Potter 9349 4000 Test Results Set CylinderI Age@ Total Load I CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 6755 05-03-01 7 115500 4090 6755 05-24-01 28 139850 4950 6755 05-24-01 28 188530 6670 5810 6755 Hold H 2 6756 05-03-01 7 124870 4420 6756 05-24-01 28 146760 5190 6756 05-24-01 28 152710 5400 5300 6756 Hold H 3 6757 05-03-01 7 118650 4200 6757 05-24-01 28 156430 5540 6757 05-24-01 28 163440 5780 5660 6757 Hold H 4 6758 05-03-01 7 130520 4620 6758 05-24-01 28 153960 5450 6758 05-24-01 28 159940 5660 5560 6758 Hold H 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 ,, TEL [214] 350 5600 · FAX [214] 350 0019 No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 5 6759 05-03-01 7 129960 4600 6759 05-24-01 28 155130 5490 6759 05-24-01 28 158610 5610 5550 6759 Hold H 6 6760 05-03-01 7 120340 4260 6760 05-24-01 28 159600 5650 6760 05-24-01 28 165320 5850 5750 6760 Hold H 7 6761 05-03-01 7 104130 3680 6761 05-24-01 28 139420 4930 6761 05-24-01 28 148790 5270 5100 6761 Hold H 8 6762 05-03-01 7 125320 4430 6762 05-24-01 28 163150 5770 6762 05-24-01 28 172410 6100 5940 6762 Hold H Cylinder Data Set CylinderI Time ofI [Concrete Air I Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 6755 4.50 5:45AM 56 72 N/A 61585 2 6756 4.75 6:00PM 56 68 N/A 610595 3 6757 4.50 7:30AM 60 69 N/A 610606 4 6758 5.00 8:35AM 60 72 N/A 610615 5 6759 5.50 10:15AM 63 75 N/A 610626 6 6760 5.00 11:15AM 68 77 N/A 610636 7 6761 4.75 11:45AM 76 79 N/A 610644 8 6762 5.00 1:15PM 77 80 N/A 610652 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Raymond Construction/ Mr. Dave Schlimme Original Signed By (1) City of Coppell/Mr. Larry Davis Keith Atkins KEA/je