Loading...
Freeport NIP(7.3)-LR010425 GEOTECHNICALAND ~ f==J I-"1 I I J=~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 67 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7570 Dallas, Texas 75240 SAMPLE DATE: 04-25-01 ATTN: Mr. Jeff Langston TECHNICIAN: R. Yeoman CONTRACTOR: Raymond Construction Location of Sample Set Number I Location I Quantity Represented 1 Floor slab at A.5-14 50/925 2 Floor slab at B-13 150/925 3 Floor slab at C.5-12.8 250/925 4 Floor slab at E-13 360/925 5 Floor slab at F-13.5 460/925 6 Floor slab at G-13 560/925 7 Floor slab at J-14 670/925 6 Floor slab at F-12.5 740/925 9 Floor slab at L-13 880/925 Design Information J Source of Concrete I Mix Identification I Specified Strength p.s.i. Potter 9349 4000 Test Results Set Cylinder I Age@ Tote, Load I CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 6535 05-02-01 7 131230 4640 6535 05-23-01 28 171800 6080 6535 05-23-01 28 172110 6090 6090 6535 Hold H 2 6536 05-02-01 7 118220 4180 6536 05-23-01 28 158750 5620 6536 05-23-01 28 166510 5890 5760 6536 Hold H 3 6537 05-02-01 7 138310 4890 6537 05-23-01 28 171380 6070 6537 05-23-01 28 174500 6180 6130 6537 Hold H 4 6538 05-02-01 7 116070 4110 6538 05-23-01 28 158990 5630 6538 05-23-01 28 160390 5680 5660 6538 Hold H 2424 STUTZ DR, · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Set Cylinder I Age @ Total Load Compressive Average No. ID I Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 5 6539 05-02-01 7 130040 4600 6539 05-23-01 28 175680 6220 6539 05-23-01 28 181410 6420 6320 6539 Hold H 6 6540 05-02-01 7 142070 5030 6540 05-23-01 28 177180 6270 6540 05-23-01 28 179110 6340 6310 6540 Hold H 7 6541 05-02-01 7 138470 4900 6541 05-23-01 28 186490 6600 6541 05-23-01 28 187000 6620 6610 6541 Hold H 8 6542 05-02-01 7 126350 4470 6542 05-23-01 28 150770 5340 6542 05-23-01 28 162120 5740 5540 6542 Hold H 9 6543 05-02-01 7 132300 4680 6543 05-23-01 28 170250 6030 6543 05-23-01 28 183480 6490 6260 6543 Hold H Cylinder Data Set Cylinder Time of Concrete I Air Ticket No. ID Slump Sample AirTemp. Temp. I Entrainment Number 1 6535 4.50 5:00AM 48 63 N/A 610485 2 6536 4.50 5:45AM 53 69 N/A 610495 3 6537 4.75 6:40AM 56 72 N/A 610505 4 6538 4.75 7:25AM 56 72 N/A 610516 5 6539 5.00 8:20AM 57 70 N/A 610526 6 6540 5.00 9:20AM 58 70 N/A 610536 7 6541 4.50 10:15AM 70 75 N/A 610547 8 6542 4.50 10:50AM 76 80 N/A 610554 9 6543 4.50 12:50PM 78 82 N/A 610568 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Raymond Construction/ Mr. Dave Schlimme Original Signed By (1) City of Coppell/Mr. Larry Davis Keith Atkins KEA/je GEOTECHNICAL AND J ENVIRONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 66 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7570 Dallas, Texas 75240 SAMPLE DATE: 04-25-01 ATTN: Mr. Jeff Langston TECHNICIAN: S. Davis CONTRACTOR: Raymond Construction Location of Sample Set Number I Location I Quantity Represented 1 Piers: K.6-21, K.3-21, J-21 and J.5-21 10/10 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. Potter 9337 3000 Test Results Set Cylinder J Age @ Total Load Compressive I Average No. ID J Date Tested Test lbs. Strength p.s.i.J Strength p.s.i. 1 6555 05-02-01 7 118170 4180 6555 05-23-01 28 154360 5460 6555 05-23-01 28 156420 5540 5500 6555 Hold H Cylinder Data Set Cylinder J Time of Concrete Air Ticket No. ID Slump J Sample AirTemp. Temp. Entrainment Number I 6555 4.00 1:45PM 85 75 N/A 610576 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Raymond Construction/ Mr. Dave Schlimme Original Signed By (1) City of Coppell/Mr. Larry Davis Keith Atkins KEA/je 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Ea J I~:r-I[:SlI--IEERII--II:S GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation REPORT NO. 66 5495 Belt Line Road, Suite 360 REG PROJECT NO. 7570 Dallas, Texas 75240 SAMPLE DATE: 04-25-01 ATTN: Mr. Jeff Langston TECHNICIAN: S. Davis CONTRACTOR: Raymond Construction Location of Sample Set Number I Location I Quantity Represented 1 Piers: K.6-21, K.3-21, J-21 and J.5-21 10/10 Design Information I Source of Concrete I Mix Identification I Specified Strength p.s.i. Potter 9337 3000 Test Results Set Cylinder [ I Age~ Tota, Load I CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i. 1 6555 05-02-01 7 118170 4180 6555 05-23-01 28 6555 05-23-01 28 6555 Hold H Cylinder Data Set J Cylinder Time ofI J Concrete Air Ticket lNo. ID Slump Sample Air Temp. Temp. Entrainment Number 6555 4.00 1:45PM 85 75 N/A 610576 Mail Submitted by: Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston REED ENGINEERING GROUP, INC. (1) Raymond Construction/ Mr. Dave Schlimme Original Signed By (1) City of Coppell/Mr. Larry Davis Keith Atkins KEA/je 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 o FAX [214] 350 0019