Freeport NIP(7.3)-LR010329GEOTECHNICAL AND J~ J:=:J r-i I I p
ENVIRONMENTAL CONSULTANTS
POST INJECTION CONFIRMATION RESULTS
Freeport VII
Royal Lane, North of Bethel Road
Coppell, Texas
REPORTED TO: Duke-Weeks Realty Corporation
5495 Belt Line Road, Suite 360
Dallas, Texas 75240
ATTN: Mr. Jeff Langston
REPORT NO. 19
REPORT DATE: 03-29-01
REG PROJECT NO. 7570
PAGE: 1 of 1
CONTRACTOR: Raymond Construction
AREA REPRESENTED: Northern Portion of Pad
Boring Number/Pocket Pen
Date
Sampled I Depth
W-39
03-19-01
0.0- 1.5 1.70 1.00 1.40 1.30 1.00 0.70
1.5- 3.0 2.00 2.50 4.40 2.50 1.00 3.05
3.0- 4.5 4.50 4.5+ 2.50 3.00 1.40 1.90
4.5- 6.0 4.5+ 4.5+ 2.80 4.50 1.30 2.20
6.0- 7.5 4.5+ 3.50 2.50 4.5+ 1.80 3.60
7.5- 9.0 3.50 4.00 3.30 4.5+ 1.80 2.75
9.0- 10.0 2.00 3.00 3.80 4.5+ 1.55 3.50
Comments:
Borings obtained after two injection passes. Based on these results, an additional
pass is considered necessary, for a 60' side strip 125'S, 400'E of the N.W. building
corner. Extend injection 5' beyond building lines. Confirmation borings are not
considered necessary.
Mail
Distribution: (1) Duke-Weeks Realty Corporation/
Mr. Jeff Langston
(1) Raymond Construction/
Mr. Dave Schlimme
(1) City of Coppell/Mr. Larry Davis
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
BW/cg
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019