Loading...
Freeport NIP(7.3)-LR010329GEOTECHNICAL AND J~ J:=:J r-i I I p ENVIRONMENTAL CONSULTANTS POST INJECTION CONFIRMATION RESULTS Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston REPORT NO. 19 REPORT DATE: 03-29-01 REG PROJECT NO. 7570 PAGE: 1 of 1 CONTRACTOR: Raymond Construction AREA REPRESENTED: Northern Portion of Pad Boring Number/Pocket Pen Date Sampled I Depth W-39 03-19-01 0.0- 1.5 1.70 1.00 1.40 1.30 1.00 0.70 1.5- 3.0 2.00 2.50 4.40 2.50 1.00 3.05 3.0- 4.5 4.50 4.5+ 2.50 3.00 1.40 1.90 4.5- 6.0 4.5+ 4.5+ 2.80 4.50 1.30 2.20 6.0- 7.5 4.5+ 3.50 2.50 4.5+ 1.80 3.60 7.5- 9.0 3.50 4.00 3.30 4.5+ 1.80 2.75 9.0- 10.0 2.00 3.00 3.80 4.5+ 1.55 3.50 Comments: Borings obtained after two injection passes. Based on these results, an additional pass is considered necessary, for a 60' side strip 125'S, 400'E of the N.W. building corner. Extend injection 5' beyond building lines. Confirmation borings are not considered necessary. Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. BW/cg 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019