Loading...
Freeport NIP(7.3)-LR010305 GEOTECHNICAL AND ~ F::q r--t i i p ENVIRONMENTAL CONSULTANTS REPORT OF LABORATORY COMPACTION TEST Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston REPORT NO. 11 REPORT DATE: 03-05-01 REG PROJECT NO. 7570 SAMPLE DATE: 01-27-01 CONTRACTOR: Raymond Construction Curve Optimum Maximum No. Soil Classification Proctor Type Moisture, % Density, pcf Reddish brown & 4 yellowish brown clay ASTM D-698 20.0 97.5 98.5 97.5 96.5 95.5 ~94.5 93.5 92.5 90.5 16.0 18.0 20.0 22.0 24.0 Moisture Content (%) ~, 4.5 · ~- 4.0 '~3.5 oE3. "~ 2.5 ~ 2.0 '~ 1.5 n 1.0 16.0 18.0 20.0 22.0 24.0 Moisture Content (%) Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. JFP/cdl 2424 STUTZ DR. ,, SUITE 400 ,, DALLAS, TX 75235 · TEL [214] 350 5600 ,, FAX [214] 350 0019 GEOTECHNICAL AND G J~J I"-1 ENVIRONMENTAL CONSULTANTS REPORT OF LABORATORY COMPACTION TEST Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston REPORT NO. 10 REPORT DATE: 03-05-01 REG PROJECT NO. 7570 SAMPLE DATE: 01-25-01 CONTRACTOR: Raymond Construction Curve Optimum Maximum No. Soil Classification Proctor Type Moisture, % Density, pcf Reddish brown & light 3 brown clay ASTM D-698 22.5 96.0 97.0 96.0 95.0 94.0 93.0 92.0 ~'91.0 90.0 89.0 88.0 16.5 18.5 20.5 22.5 24.5 26.5 Moisture Content (%) 4.5 4.0 ~3.5 oE3. 2.0 1.5 1.0 16.5 21.5 26.5 31.5 Moisture Content (%) Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. JFP/cdl 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND J~ F:;:J ~1 I I p ENVIRONMENTAL CONSULTANTS REPORT OF LABORATORY COMPACTION TEST Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston REPORT NO. 9 REPORT DATE: 03-05-01 REG PROJECT NO. 7570 SAMPLE DATE: 01-25-01 CONTRACTOR: Raymond Construction Curve Optimum Maximum No. Soil Classification Proctor Type Moisture, % Density, pcf 2 Reddish brown clay ASTM D-698 25.0 94.0 95.0 94.0 93.0 92.0 91.0 90.0 89.0 88.0 87.0 86.0 85.0 21.0 23.0 25.0 27.0 29.0 Moisture Content (%) ~. 4.5 '~- 4.0 "~ 3.5 ~ 2.5 ~ 2.0 ~ '1.5 1.0 21.0 23.0 25.0 27.0 29.0 Moisture Content (%) Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. JFP/cdl 2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND ~ J:=JJ I'--1 I I ENVIRONMENTAL CONSULTANTS REPORT OF LABORATORY COMPACTION TEST Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston REPORT NO. 8 REPORT DATE: 03-05-01 REG PROJECT NO. 7570 SAMPLE DATE: 01-25-01 CONTRACTOR: Raymond Construction Curve Optimum Maximum No. Soil Classification Proctor Type Moisture, % Density, pcf 1 Brown clayey sand ASTM D-698 10.0 116.5 117.0 113.5 113.0 6.0 8.0 10.0 12.0 14.0 Moisture Content (%) Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. JFP/cdl 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 * TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICALAND [~ J~ I-'1 I I ENVIRONMENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: CONTRACTOR: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston Raymond Construction REPORT NO. 7 REPORT DATE: 03-05-01 REG PROJECT NO. 7570 TECHNICIAN: F. Steadman PAGE: 1 of 1 On these dates a representative of Reed Engineering Group, Inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth J Injection Spacing I Injection Pressure Injection Intervals I I (psi) (in) 10 5 100-200 12-18 Equipment Number of Number of Probes J Length of Probes Probe Spacing Rigs (ea) I (ft) (ft) 3 4 12 5 Date J Area Injected (sq ft) J Avera~le Pressure (psi) J Pass No. 02-26-01 1200 185 1st 02-27-01 19,600 200 1st 02-27-01 15,700 180 2nd Surfactant added at regular intervals: Yes Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Odginal Signed By James F. Phipps, P.E. BW/myw 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECNNICALAND G J=::J I--1 I I ~ ENVIRONMENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston CONTRACTOR: Raymond Construction REPORT NO. 06 REPORT DATE: 03-05-01 REG PROJECT NO. 7570 TECHNICIAN: F. Steadman PAGE: 1 of 1 On these dates a representative of Reed Engineering Group, Inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth Injection Spacing I Injection Pressure Injection Intervals (ft) (ft) I (psi) (in) 10 5 100-200 12-18 Equipmentj I I Number of Number of Probes I Length of Probes I Probe Spacing Rigs (ea) (ft) (ft) 4 4 12 5 Date I Area Injected (sq ft) I Average Pressure (psi) I Pass No. 02-22-01 29,600 125 1 st, 2nd 02-23-01 34,700 130 2nd 02-24-01 16,800 120 2nd 02-26-01 39,800 120 2nd Surfactant added at regular intervals: Yes Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. BW/myw 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICALAND ~ ~ ~ I I F~ ENVlRONMI:NTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston CONTRACTOR: Raymond Construction REPORT NO. 4 REPORT DATE: 03-05-01 REG PROJECT NO. 7570 TECHNICIAN: F. Steadman PAGE: 1 of 1 On this date a representative of Reed Engineering Group, Inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth ,I Injection(ft)Spacing J Injection Pressure (psi) I Injecti°~nl~tervals (ft) I 10 5 100-200 12-18 Equipment Numberof I Number of Probes I Length of Probes i Probe Spacing Rigs (ea) (ft) (ft) 4 4 12.0 5 Date I Area Injected (sq ft)IAvera~le Pressure (psi) I Pass No. I 02-21-01 32,700 125 1 Surfactant added at regular intervals: Yes Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. BW/mm 2424 STUTZ DR. · SUITE 400 * DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICALAND ~ R I'-1 I I J~ ENVIRONHENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston CONTRACTOR: Raymond Construction REPORT NO. 3 REPORT DATE: 03-05-01 RED PROJECT NO. 7570 TECHNICIAN: F. Steadman PAGE: 1 of 1 On these dates a representative of Reed Engineering Group, Inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth I Injection Spacing I Injection Pressure Injection Intervals (ft) J (ft) J (psi) (in) 10 5 100-200 12-18 Equipment Number of Number of Probes I Length of Probes Probe Spacing Riss (ea) , (ft) (ft) 2 4 12.5 5 Date I Area Injected (sq ft) J Avera~le Pressure (psi) J Pass No. 02-15-01 1,500 175 1 02-16-01 8,500 175 1 02-17-01 8,600 175 1 02-19-01 29,000 150 1 02-20-01 19,800 130 1 Surfactant added at regular intervals: Yes Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. BW/mm 2424 STUTZ DR. · SUITE 400 * DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICAL AND G J=::JJ I'-'1 I I ~ ENVIRONMENTAL CONSULTANTS REPORTED TO: REPORT OF FIELD DENSITY TESTS Freeport VII Royal Lane, North of Bethel Road Coppell, Texas Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 A'I-I'N: Mr. Jeff Langston CONTRACTOR: Raymond Construction Proctor ASTM No. Standard Description REPORT NO. 2 REPORT DATE: 03-05-01 REG PROJECT NO. 7570 TECHNICIAN: R. Bullion PAGE: 1 of 1 Optimum J Maximum Moisture, % Density, PCF I D-698 Brown clayey sand 10.0 116.5 2 D-698 Reddish brown clay 25.0 94.0 3 D-698 Reddish brown & Light brown clay 22.5 96.0 4 D-698 Reddish brown & Yellowish brown clay 20.0 97.5 Depth Below Field Field Test Final S.G. Density Moisture Proctor Compaction No. Date Location (feet) (pcf) ( %) ID Level (%) 1 02-07-01 Bldg Pad: 50'S,180'W(1) 1.0 92.9 26.3 3 95.7 2 Bldg Pad: 50'S,180'W(1) 0.0 93.4 25.8 3 97.3 3 Bldg Pad: 100'S,150'W(1) 1.0 93.7 26.0 3 97.6 4 Bldg Pad: 100'S,150'W(1) 0.0 94.0 25.0 3 97.9 5 Bldg Pad: 150'S,120'W(1) 1.0 92.6 25.8 3 95.5 6 Bldg Pad: 150'S,120'W(1) 0.0 92.0 26.4 3 95.8 7 Bldg Pad: 50'S,30'W(1) 3.0 93.4 25.3 3 97.3 8 Bldg Pad: 50'S,30'W(1) 2.0 93.6 24.6 3 97.5 9 Bldg Pad: 50'S,30'W(1) 1.0 92.5 25.0 3 95.4 10 Bldg Pad: 50'S,30'W(1) 0.0 90.0 26.6 2 95.7 11 Bldg Pad: 100'S,60'W(1 ) 3.0 90.0 27.8 2 95.7 12 Bldg Pad: 100'S,60'W(1) 2.0 91.6 26.8 2 97.4 13 Bldg Pad: 100'S,60'W(1) 1.0 92.0 27.4 2 97.9 14 Bldg Pad: 100'S,60'W(1) 0.0 91.2 27.8 2 97.0 15 Bldg Pad: 150'S,90'W(1) 3.0 94.8 24.4 4 97.2 16 Bldg Pad: 150'S,90'W(1) 2.0 94.0 26.0 3 97.9 17 Bldg Pad: 150'S,90'W(1) 1.0 91.5 25.5 3 95.3 18 Bldg Pad: 150'S,90'W(1) 0.0 92.3 26.3 3 95.1 Comments: Where tested, materials were in compliance with project specifications. Footnote: (1) Measurements referenced from N.E. corner of building. Mail Distribution: (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Ronald F. Reed, P.E. KA/mm 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 GEOTECHNICALAND ~ F=~ O I I F=~- ENVIRONMENTAL CONSULTANTS POST INJECTION CONFIRMATION RESULTS Freeport VII Royal Lane, North of Bethel Road Coppell, Texas REPORTED TO: Duke-Weeks Realty Corporation 5495 Belt Line Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Jeff Langston REPORT NO. 1 REPORT DATE: 03-05-01 REG PROJECT NO. 7570 PAGE: 1 of 1 CONTRACTOR: Raymond Construction AREA REPRESENTED: Building Pad Boring Date Sampled I Depth (feet) I W-1I Number/Pocket Pen w-2 J w-3 w-4 J w-5 w-6 r w_7 01-29-01 0.0- 1.5 1.00 1.5- 3.0 1.75 3.0- 4.5 2.60 4.5- 6.0 4.5+ 6.0- 7.5 4.5+ 7.5- 9.0 4.5+ 9.0- 10.0 4.50 3.00 0.75 4.00 2.50 2.25 2.50 2.00 2.50 2.30 4.50 4.25 1.80 2.75 4.00 4.5+ 3.80 3.75 1.25 3.25 4.50 4.5+ 4.50 4.50 4.50 4.00 4.50 4.10 2.80 4.5++ 4.5+ 3.00 4.5+ 3.75 4.50 4.5++ 4.5+ 3.50 4.50 3.00 1.00 4.5+ 3.00 Comments: Mail Distribution: Boring Number/Pocket Pen Sampled JDate Depth (feet) I W-8 W-9 W-10 I W-ll J W-12 01-29-01 0.0- 1.5 3.75 4.5+ 1.25 2.00 4.5++ 1.5- 3.0 3.75 4.50 2.00 2.00 4.5++ 3.0- 4.5 3.50 4.50 4.00 4.50 3.50 4.5- 6.0 4.00 4.50 4.5+ 3.25 4.5+ 6.0- 7.5 4.25 4.5+ 4.5+ 4.5+ 4.50 7.5- 9.0 4.25 4.5+ 4.5+ 4.5+ 4.50 9.0- 10.0 4.50 4.5+ 4.5+ 4.50 4.5+ Borings obtained prior to pressure injection. Based on these results, two passes of pressure injected water should be applied to the pad. borings are considered necessary. a minimum of Confirmation (1) Duke-Weeks Realty Corporation/ Mr. Jeff Langston (1) Raymond Construction/ Mr. Dave Schlimme (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. BW/cg 2424 STUTZ DR, * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019