Loading...
Vistas of C 1stP-CS 961217 9?22191452 {~-iT--2996 O,4:41PH FROM~CEHTEX HOMES DALLAS NORTH TO 5043625 P,O1 CENTEX HOMES December 17, 1996 Mr. Gary Sims Director of Parks and Recreation City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 RE: Vistas of Coppell Development Park Trail Construction Dear Gary: Per my meeting with you and Clay Phillips last week concerning the viqt..as of Coppell residential development, I would like to verify the arrangements for construction o~t the proposed Trail along Denton Creek and disposition of the park fees for the project.~ Per our discussion, Centex is proposing construction of the park trail (to AA. SI-Fro standards) from the Max;Arthur Boulevard bridge over Denton Creek westerly to the western platted property line of Vistas of Coppell, Section 2. This will constitute approximately 3900 LF of trail construction with associated appurtenances. Our current estimate of the design and construction cost is approximately $200,000 (unless additional railings or re,~.fiffing walls are needed which could increase the cost). 'In addition, Centex will take all steps neZessary to secure an easement of sufficient width (16 fbot minimum) on the Levee Improvement District land along the length of the trail. ~ In return for the construction of the Trail> the City of Coppell will reduce the total amount of park fees due for the project by the documented amount of expenditures for construction of the Trail. Upon completion of the Trail construction, Centex will submit to the City a detailed accounting of the total costs incurred in design and constuction of the Trail. Centex will pay the diff'erence between the original park fees and the Trail construction cost to the City. In the unlikely event that the cost of construction of the Trail exceeds the total park fees which would otherwise be due, Centex reserves the right lo stop construction of the Trail and/or apply for reimbursement frown the City for the cost overage but will not be obligated for any costs of construction exceeding the park fees. Since the estimated park fees for the project exceed $275,000 versus an approximate $200,000 Trail cosL this is a very unlikely scenario. Tile construction of the T[aJl will proceed in two phases> roughly matching the phasing plan of the residential subdivision Phase I will nm from the MacArthur bridge to the westerly edge of Phase 2B and the remainder of the Trail will be constructed w/th Phase 2C. Because the construction cost of the initial phase of the Trail will likely exceed the park ~'~'.,~s othcrwi~o ~1~ 0Il 1660 S Stemrnons Frwy., Suite 230 / Lewisville, Texas 75067 t 214-221-5556 TOTAL P.O1 12-17- 1c)96 04:55PM FROM CENTEX HOMES DALLAS NORTH TO 5045625 P.02 Mr. Gary Sims December 17, 1996 Page 2 of 2 Phase 2A, 2B and 1 A, we request that any remaining credit or overage on the initial phase of Trail construction carry over to Phases lB and 2C of the residential project. We appreciate this opportumty to work with the City of Coppell on a mutually beneficial goal and look forward to the start of construction of the project and the Trail. If there are any clarifications or corrections to this understanding, please contact me as soon as possible. Sincerely, CENTE~,HOMES Derek E. Earle, PE Land Development Manaser Dallas North Division CCi Mr. C!ay Phillips Mr. Gary Sieb Mr. Ken Griffin Mr. Jim Witt TOTAL P. 02