CF-Coppell Rd SC-LR011120 Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REINFORCING STEEL PLACEMENT INSPECTION
CLIENT: Texas Unified Constructors, Inc. DATE: 20 November 2001
PROJECT: Field Service Offices & Maintenance Facility JOB NO. 01.1054
Coppell, TX
TIME: 1.5 hours
AREA INSPECTED: Service Center Building grade beams: A3.5 line to A6.5 line,
A to F.5 on 5 and 6.5 line
DATE OF INSPECTION: 11/20/01 (1:00pm-2:30pm)
DEFICIENCIES NOTED:
CORRECTIONS
NUMBER LOCATION/ITEM DESCRIPTION OBSERVED
1 Clean off tops of piers. Yes
2 Slab dowels to be placed after concrete placement. Yes
TECHNICIAN: RJW
DISTRIBUTION: (3) City of Coppell
(1) Vidaud & Associates
(1) Doyle Engineering Group
(1) Texas Unified Constructors, Inc.
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Texas Unified Constructors, Inc. DATE: 20 November 2001
PROJECT: Field Service Offices & Maintenance Fac. JOB NO.: 01.1054
Coppell, TX
MATERIAL DESCRIPTION: 1) On-Site Fill - Dark Grey Clay
ASTM D 698 STANDARD PROCTOR: 1) 95.0 pcf @ 22.0% Moisture
MOISTURE DRY PERCENT REQUIRED
LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
BELOW
Backfill Over South Water Line SUBGRADE
99) @ midpoint 1 1 '-2' 22.0 96.5 101.6 95 +
Optimum +/- 2%
Backfill Over Sanitary Sewer Line
100) approx. Station 1 +50 1 1' 22.7 95.2 100.2
101) 4" lateral, 100' west of main line 1 3' 23.8 90.5 95.3
NOTE: All tests passed the project requirements for density and moisture.
TECHNICIAN: CDJ ~,~ ~
DISTRIBUTION: (3) City of Coppell
(1) Vidaud & Associates
(1) Doyle Engineering Group
(1) Texas Unified Constructors, Inc.
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148