Loading...
CF-Coppell Rd SC-LR011119 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Texas Unified Constructors, Inc. DATE: 19 November 2001 PROJECT: Field Service Offices & Maintenance Fac. JOB NO.: 01.1054 Coppell, TX MATERIAL DESCRIPTION: 1) On-Site Fill - Dark Grey Clay ASTM D 698 STANDARD PROCTOR: 1) 95.0 pcf @ 22.0% Moisture MOISTURE DRY PERCENT REQUIRED LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % BELOW Backfill Over Sanitary Sewer Line SUBGRADE 96) 4" lateral, 80' west of main line 1 2' 23.6 91.8 96.6 95+ Optimum +/- 2% 97) 6" lateral, 40' west of main line 1 1' 20.6 90.5 95.3 Backfill Over Waater Line South of Service Center 98) 60' west of SE corner of building 1 1' 23.7 94.3 99.2 TECHNICIAN: MFM DISTRIBUTION: (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148