Loading...
CF-Coppell Rd SC-LR011116 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Texas Unified Constructors, Inc. DATE: 16 November 2001 PROJECT: Field Service Offices & Maintenance Fac. JOB NO.: 01.1054 Coppell, TX MATERIAL DESCRIPTION: 1 ) On-Site Fill - Dark Grey Clay ASTM D 698 STANDARD PROCTOR: 1) 95.0 pcf @ 22.0% Moisture MOISTURE DRY PERCENT REQUIRED LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % BELOW Backfill Over Sanitary Sewer Line SUBGRADE 93) approx. Station 2+25 1 1'-2' 23.2 91.6 96.4 95+ Optimum +/- 2% 94) approx. Station 0 + 65 1 2'-3' 23.6 97.7 102.8 Backfill Over Temporary Sanitary Sewer Line 95) approx. 100' south of north end 1 3' 20.0 93.3 98.3 NOTE: All tests passed project requirements for density and moisture. TECHNICIAN: CDJ DISTRIBUTION: (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REINFORCING STEEL PLACEMENT INSPECTION CLIENT: Texas Unified Constructors, Inc. DATE: 16 November 2001 PROJECT: Field Service Offices & Maintenance Facility JOB NO. 01.1054 Coppell, TX TIME: 2.0 hours AREA INSPECTED: Grade beams on carton forms for service office: line 0.1 from E.8 to C.6; line 1 from C.5 to F.5; line C.6 from 0.1 to 1; line E.1 from 0.1 to 1; line E.5 from 0.1 to 1; line E.7 from 0.1 to 1; line F.1 from 2 to 3; line 2 from E.5 to F.5; and line 3 from E.5 to F.5 DATE OF INSPECTION: 11/16/01 (11:00am-1:00pm) DEFICIENCIES NOTED: CORRECTIONS NUMBER LOCATION/ITEM DESCRIPTION OBSERVED 1 Reinforcing on carton forms. Yes 2 Dirt and trash on carton forms. Yes 3 Ties not 5" from edge of pier. Yes TECHNICIAN: EWM DISTRIBUTION: (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 01.1054 CLIENT: Texas Unified Constructors, Inc. DATE: 16 November 2001 PROJECT: Field Service Offices & Maint. Fac., Coppell SUPPLIER: Lattimore LOCATION OF POUR SET 1: Grade beams on carton forms: line F. 1 from 2to3; line 2 from E.5 to F.5; line 3 from E.5 to F.5 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 54 Truck No. 8060 Cement Ticket No. 3137009 Flyash Time Batched 1 2:21 pm Sand Time Sampled 1:1 Opm in. Concrete Temp, (ASTM C1064) 74°F 1.0 in. Air Content (ASTM C231) Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA COIIEPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 57 5.00 7 11/23/01 79,700 2820 58 5.00 28 12/14/01 59 5.00 28 1 2/14/01 60 5.00 56 01/11/02 28-Day Average 3000 TECHNICIAN: EWM (1:00pm-2:30pm) DISTRIBUTION: (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148