Loading...
CF-Coppell Rd SC-LR011029 (2) Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 01.1054 CLIENT: Texas Unified Constructors, Inc. DATE: 29 October 2001 PROJECT: Field Service Offices & Maint. Fac., Coppell SUPPLIER: Lattimore LOCATION OF POUR SET 1: Piers: G/7, G/6.5, G/5and F.1/5 on service center building LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 54 Truck No. 938 Cement 414 Type I Ticket No. 7109983 Flyash 103 Time Batched 2:44pm Sand 1433 Time Sampled 3:15pm in. Concrete Temp. (ASTM C1064) 71 °F 1.0 in. 1850 Air Content (ASTM C231) Water 250 Unit Weight (ASTM C1381 Admix //1 Plastocrete 161 @ 15.5 oz. Admix //2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 17 5.25 7 11/05101 106,000 3750 18 5.25 28 11/26/01 148,300 5250 1 9 5.25 28 11/26/01 146,100 5170 20 5.25 56 12/24/01 28-Day Average 5210 3000 TECHNICIAN: EWM ~ ~ DISTRIBUTION: (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148