Loading...
Coppell Industrial-LR011025 GEOTECHNICAL AND ~ F::=I r'-'l LJ F:m ENVlRONPIENTAL CONSULTANTS ~' Tra~PointOne Betl~el4~oad and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 213 c/o Champion Partners, Ltd. REPORT DATE: 10-25-01 15601 Dallas Parkway, Suite 100 REG PROJECT NO. 7394 Addison, Texas 75001 DATE OBSERVED: 10-10-01 ATTN: Mr. Kerry Burden TECHNICIAN: D. Rico PAGE: 1 of 1 CONTRACTOR: C.D. Henderson, Inc. I Items Observed: I Paving: 100'-400'S, 0'-30'W and 800'-1100'S and 0'-30'W from N.W. corner of Building 1. Paving: 100'-400'S, 0'-30'E and 800'-1000'S and 0'-30'E from N.E. corner of Building 1. I Reference Plans or Notes Used: I Sheet C4 [ X ]There were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Haynes Whayley Associates, Inc./ James F. Phipps, P.E. Mr. Kent Penrod BW/mm (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Extranet Distribution: (1) Meinhardt & Quintana/ Mr. David Meinhardt 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEl_ [214] 350 5600 · FAX [214] 350 0019