Loading...
ST9601-LR 990605TEAM Consultants, Inc. Geotechnical Environmental Construction Materials Testing CONCRETE STRENGTH REPORT (ASTM C-39), (ASTM C-78) OR (TEX-4:!.8-A), (TEX-448-A) Mr. Robert Caudill Tiseo Paving P O Box 270040 Dallas, TX 75227 DATE: 06/05/1999 JOB NO.: 985142 REPORT NO.: 72 PROJECT: Wrangler Drive Coppell, Texas Cyl or Beam No. Location 49- A Sta 29+50 B C D E 50- A Sta 32+50 B C D E 51- A Sta 35+50 B C D E 52- A Sta 39+50 B C D E 53- A Sta 42+65 B C D E 5 day break Slump(in.) Air (%) Strength (psi) Date Date ASTM ASTM 28-Day Break Made (C-143) (C-231) 7-Day 28-Day Specs. 06/01 05/27 2.75 5.0 1840* 3000 06/03 05/27 2090 06/03 05/27 2230 06/24 05/27 06/24 05/27 06/01 05/27 4.00 4.5 1930' 3000 06/03 05/27 2120 06/03 05/27 2260 06/24 05/27 06/24 05/27 06/01 05/27 3.00 4.5 2190' .. 3000 06/03 05/27 2560 06/03 05/27 2580 06/24 05/27 06/24 05/27 06/01 05/27 3.50 6.0 2140' 3000 06/03 05/27 2460 06/03 05/27 2370 06/24 05/27 06/24 05/27 06/01 05/27 4.00 5.0 2280* 3000 06/03 05/27 2650 06/03 05/27 2580 06/24 05/27 06/24 05/27 Conical fracture on cylinders unless otherwise noted. Cylinder diameter 6.00" unless otherwise noted. TEAM Consultants, Inc. ke cc: City of Coppell 2970 S. Walton Walker, Suite 101 3101 Pleasant Valley, Suite 101 ~: ~~ ~ ,~ ~ Ronald L. Bannister Dallas, TX 75211 Arlington, TX 76015 (214) 331-4395 (817) 467-5500 Fax (214) 331-4458 Fax (817) 468-9920