ST9601-LR 990605TEAM Consultants, Inc.
Geotechnical Environmental Construction Materials Testing
CONCRETE STRENGTH REPORT
(ASTM C-39), (ASTM C-78) OR (TEX-4:!.8-A), (TEX-448-A)
Mr. Robert Caudill
Tiseo Paving
P O Box 270040
Dallas, TX 75227
DATE: 06/05/1999
JOB NO.: 985142
REPORT NO.: 72
PROJECT: Wrangler Drive
Coppell, Texas
Cyl or
Beam
No. Location
49- A Sta 29+50
B
C
D
E
50- A Sta 32+50
B
C
D
E
51- A Sta 35+50
B
C
D
E
52- A Sta 39+50
B
C
D
E
53- A Sta 42+65
B
C
D
E
5 day break
Slump(in.) Air (%) Strength (psi)
Date Date ASTM ASTM 28-Day
Break Made (C-143) (C-231) 7-Day 28-Day Specs.
06/01 05/27 2.75 5.0 1840* 3000
06/03 05/27 2090
06/03 05/27 2230
06/24 05/27
06/24 05/27
06/01 05/27 4.00 4.5 1930' 3000
06/03 05/27 2120
06/03 05/27 2260
06/24 05/27
06/24 05/27
06/01 05/27 3.00 4.5 2190' .. 3000
06/03 05/27 2560
06/03 05/27 2580
06/24 05/27
06/24 05/27
06/01 05/27 3.50 6.0 2140' 3000
06/03 05/27 2460
06/03 05/27 2370
06/24 05/27
06/24 05/27
06/01 05/27 4.00 5.0 2280* 3000
06/03 05/27 2650
06/03 05/27 2580
06/24 05/27
06/24 05/27
Conical fracture on cylinders unless otherwise noted.
Cylinder diameter 6.00" unless otherwise noted.
TEAM Consultants, Inc.
ke
cc: City of Coppell
2970 S. Walton Walker, Suite 101
3101 Pleasant Valley, Suite 101
~: ~~ ~ ,~ ~
Ronald L. Bannister
Dallas, TX 75211
Arlington, TX 76015
(214) 331-4395
(817) 467-5500
Fax (214) 331-4458
Fax (817) 468-9920