Loading...
Coppell Industrial-LR011024 I:;IEE:D J El=Ir-- I I=IE EF;III=II~ GEOTECHNICAL AND ~ J::::J !'--! U j=:::l ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT TradePoint One Bethel Road and Royal Lane Coppell, Texas REPORTED TO: CP-Coppell Industrial, Ltd. REPORT NO. 211 c/o Champion Partners, Ltd. REG PROJECT NO. 7394 15601 Dallas Parkway, Suite 100 SAMPLE DATE: 10-04-01 Addison, Texas 75001 TECHNICIAN: S. Holliday ATTN: Mr. Kerry Burden CONTRACTOR: C.D. Henderson, Inc. Location of Sample Set Number I Location I Quantity Represented 1 Slab leaveout at A-10 60/100 Design Information IS°urce °f C°ncretePotter I Mix Identification I Specified Strength p.s.i. 3000 I Test Results Set CylinderI Age@ Total Load I CompressiveI Average No. ID Date Tested Test lbs. Strength p.s.i. Strength p.s.i, 1 4075 10-11-01 7 122700 4340 4075 11-01-01 28 4075 11-01-01 28 4075 Hold H Cylinder Data Set Cylinder Time of Concrete Air Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 4075 5.00 11:00AM 65 79 N/A N/A Mail Submitted by: Distribution: (1) Champion Partners, Ltd./ Mr. Kerry Burden REED ENGINEERING GROUP, INC. (1) C.D.Henderson, Inc./ Mr. Jason Nunley Original Signed By (1) AECC, Inc./Mr. Fran Carter (1) Haynes Whayley Associates, Inc./ Keith Atkins Mr. Kent Penrod KEA/je (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Potter Concrete/Mr. Brant Cox Extranet Distribution: (1) Meinhardt & Quintana/ Mr. David Meinhardt 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019