Loading...
Magnolia Village-LR011001 REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 · TESTED FOR CONSTRUCTION MANAGEMENT GROUP DATE 10/01/01 DALLAS, TEXAS PROJECT MAGNOLIA RETAIL OUR REPORT NO. 01614-42 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID om~uu MAXIMUM LAB IN PLACE IN ~ P~I~CENT NO. DATEDEPTH'~ NUMBER ~ DffiY ~ MOIb~FURE DRY Dr~N~TY COMP~ON COMMENT* % ~ % PCF 98 10/01101 FG 3 8.0 126.5 4.6 106 84 1-BC 99 10/01/01 FG 3 8.0 126.5 5.7 85 67 1-BC 100 10101101 FG 3 8.0 126.5 4.4 87 68 1-BC TEST LOCATION: ~ 98 SOUTH BOUND RIGHT TURN IN ON DENTON TAP ROAD AT PAVING STATION ffi:)+10 99 SOUTH BOUND RIGHT TURN IN ON DENTON TAP ROAD AT PAVING STATION ffi:]+60 100 SOUTH BOUND RIGHT TURN IN ON DENTON TAP ROAD AT PAVING STATION #1+00 CC: LARRY DAVES, CITY OF COPPELL - LEE STONE, CITY OF COPPELL ~ //~ 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS~ 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS R~pectf~ 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS ~ Jj 4. CEMENT TREATED D. RETEST Geotechnical Engineedng · Construction Materials Testing · Environmental Engineering · Consulting REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.. Sutte 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR CONSTRUCTION MANAGEMENT GROUP DATE 10/01/01 DALLAS, TEXAS PROJECT MAGNOLIA RETAIL OUR REPORT NO. 01614-41 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OP~4UM MAXJMUM LAB IN PLACE IN Pt. ACE PERCENT NO. DATEDEPTH'"~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DEN.SITY COMPACTION COMMENT* % PCF % PCF 93 10101/01 FG-4.0 1 14.5 107 16.9 107 100 1-A 94 10/01/01 FG-3.0 1 14.5 107 16.9 106 99 1-A 95 10101/01 FG-2.0 1 14.5 107 17.0 107 100 1-A 96 10/01/01 FG-1.0 I 14.5 107 17.6 105 98 1-A 97 10101/01 FG 1 14.5 107 16.6 107 100 1-A TEST LOCATION: 93 WATER LINE, 20' WEST AND 10' SOUTH FROM NORTHWEST CORNER OF BUILDING PAD 94 WATER LINE, 20' WEST AND 10' SOUTH FROM NORTHWEST CORNER OF BUILDING PAD 95 WATER LINE, 20' WEST AND 10' SOUTH FROM NORTHWEST CORNER OF BUILDING PAD 96 WATER LINE, 20' WEST AND 10' SOUTH FROM NORTHWEST CORNER OF BUILDING PAD 97 WATER LINE, 20" WEST AND 10' SOUTH FROM NORTHWEST CORNER OF BUILDING PAD - LEE STONE, CITY OF COPPELL 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPEClFI 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLYWlTH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D. RETEST of our name & test results must rece/ve our wflt~n approval. Test resufl:a & reports apply only to the sample~ tested and/or obse~ed, and are not indica~ ' ' ..~pecimens. Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting