Freeport NIP(2.2)-LR011127REPORT OF DRILLED PIER OBSERVATION Report Number:' 94011204.0059 ~'~E~,~. Service Date: November 12, 2001 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: TNA North American, Inc. Report Date: November 27, 2001 Attn: Terry Raley Project: Sales Office & Warehouse Fac. 1321 Valwood Parkway, Suite 440 Coppell, Texas Carrollton TX 75006 Project Number: 94011204 Services: Drilled pier observation. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier observation. HBC's technician arrived at the jobsite at 7:30 a.m. The superintendent with Pacific Builders informed HBC's technician to standby while he called the drilling company. At 8:15 a.m., HBC's technician was advised that pier drilling for this date was cancelled due to availability of pier drilling rigs. Technician: Steve Campbell Report Distribution: ' nc. (1) TNA North American, Inc. (1) FACServices Inc (1) Carrell Poole & Yost Architecture (1) David Kent Reviewed by: (1) R L Goodson Consulting Engineers (1) City of Coppell - Bldg Insp Eric J. Cleveland, P.E. (1) Pacific Builders Inc (1) City of Coppell - Constr Insp Senior Project Engineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the propedies of other apparently similar or identical materials. Page 1 of 1 REPORT OF STRUCTURAL STEEL OBSERVATION Report Number: '94011204.0058 8901 Carpenter Frwy., Suite//100 Service Date: November 10, 2001 Dallas, Texas 75247 (214) 630-1010 Client: TNA North American, Inc. Report Date: November 27, 2001 Attn: Terry Raley Project: Sales Office & Warehouse Fac. 1321 Valwood Parkway, Suite 440 Coppell, Texas Carrollton TX 75006 Project Number: 94011204 Services: Structural steel observation. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for structural steel observation. A visual reobservation (refer to Structural Steel Observation Report #94011204.0057, dated 11/09/01)was conducted on the Roof Level Framing as noted below. 1. Girder to column and girder to panel connections were now found to be compliant except tails. 2. Joist seat welds were now found to be compliant except along line A. 3. Joist bridging was now found to be compliant except at tie-in to panels. 4. Beam to column and beam to seat connections still were found to be incomplete. 5. Welder certifications were still unavailable for review. 6. Perimeter angle was now found to be compliant. Technician: Melvin Luttrell Report Distribution: (1) TNA North American, Inc. (1) FACServices Inc (1) Carrell Poole & Yost Architecture (1) David Kent Reviewed by: v c,- E.///_./, - (1) R L Goodson Consulting Engineers (1) City of Coppell - BIdg Insp Eric J. Cleveland, P.E. (1) Pacific Builders Inc (1) City of Coppell - Constr Insp Senior Project Engineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 ~s~Fu~e REPORT OF STRUCTURAL STEEL OBSERVATION Report Number:- 94011204.0064 8901 Carpenter Frwy., Suite #100 Service Date: November 13, 2001 Dallas, Texas 75247 (214) 630-1010 Client: TNA North American, Inc. Report Date: November 27, 2001 Attn: Terry Raley Project: Sales Office & Warehouse Fac. 1321 Valwood Parkway, Suite 440 Coppell, Texas Carrollton TX 75006 Project Number: 94011204 Services: Structural steel observation. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for structural steel observation. A visual observation was conducted as noted below. 1. Reobservation of Structural Steel Observation Report #94011204.0057, dated 11/09/01, Item 7, perimeter angle was now found to be compliant. 2. Reobservation of Structural Steel Observation Report #94011204.0058, dated 11/10/01, Item 2, joist seat welds along line A were now found to be compliant. 3. Reobservation of Structural Steel Observation Report #94011204.0061, dated 11/12/01, metal deck installation, puddle welds and side laps screws were now found to be compliant. Technician: Melvin Luttrell J JJ.,/' jJ Report Distribution: ~/~~8f~ering, Inc. (1) TNA North American, Inc. (1) FACServices Inc (1) Carrell Poole & Yost Architecture (1) David Kent Reviewed by: (1) R L Goodson Consulting Engineers (1) City of Coppell - Bidg Insp Edc J. Cleveland, P.E. (1) Pacific Builders Inc (1) City of Coppell- Constr Insp Senior Project Engineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 g~s~,~-F,,~,.~,, "1' 'r~'~ CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94011204.0063 8901 Carpenter Frwy., Suite #100 Service Date: November 13, 2001 Dallas, Texas 75247 (214) 630-1010 Client: TNA North American, Inc. Report Date: November 27, 2001 Attn: Terry Raley Project: Sales Office & Warehouse Fac. 1321 Valwood Parkway, Suite 440 Coppell, Texas Carrollton TX 75006 Project Number: 94011204 Material Information Sample Information Specified Strength: 3000 psi @ 28 Days Sample Time: 11:30am Date Cast: November 13, 2001 Technician: Steve Campbell Batch Time: 9:42am Plant: 31 Weather Conditions: Cloudy, foggy Supplier: TXI Accumulative Yards: 10 Truck No: 103 Ticket No: 3022791 Placement Method: Direct Discharge Mix I.D. No.: 9505 Sample Locations: Pier C.7-7.3 Placement Location: Piers- B.4-7.2, B.7-7.2, B.9-7.2, C.3-7.3, C.7-7.3 Field Test Data Test Result Specification Test Method Slump, inches: 6.75 5-7 ASTM C-143 Air Content, %: N/A Concrete Temperature,© F: 76 ASTM C1064 Ambient Temperature, o F: 65 ASTM C-1064 Plastic Unit Weight, pcf: Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No. ID (inches) (sq. inches) Tested (days) (lbs) (psi) 1 1 6.00 28.27 11/20/2001 7 70,490 2,490 1 2 6.00 28.27 11/20/2001 7 70,220 2,480 Average 2,490 1 3 12/11/2001 28 1 4 12/11/2001 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Steve Campbell Report Distribution: ~/~.gJn'e' ' ering, Inc. (1) TNA North American, Inc. (1) FACServices Inc (1) Carrell Poole & Yost Architecture (1) David Kent Reviewed by: (1) R L Goodson Consulting Engineers (1) City of Coppell - Bldg Insp /-//~rrC'J~.'Cleveland, P.E. (1) Pacific Builders Inc (1) City of Coppell - Constr Insp Senior Project Engineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page I of 1 CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94011204.0069 ~,~N~.~. 8901 Carpenter Frwy., Suite #100 Service Date: November 19, 2001 Dallas, Texas 75247 (214) 630-1010 Client: TNA North American, Inc. Report Date: November 27, 2001 Attn: Terry Raley Project: Sales Office & Warehouse Fac. 1321 Valwood Parkway, Suite 440 Coppell, Texas Carrollton TX 75006 Project Number: 94011204 Material Information Sample Information Specified Strength: 3000 psi @ 28 Days Sample Time: 7:20am Date Cast: November 19, 2001 Technician: Jason Kale Batch Time: 6:32am Plant: 41 Weather Conditions: Windy, cloudy Supplier: TXI Accumulative Yards: 10 Truck No: 922 Ticket No: 3026747 Placement Method: Pump Mix I.D. No.: 9505 Sample Locations: C-D, 6.8-C Placement Location: Elevated slab on metal second floor mezzanine Line 6-7 (See attached sketch) Field Test Data Test Result Specification Test Method Slump, inches: 5.75 2-4 ASTM C-143 Air Content, %: 3.1 N/A ASTM C-231 Concrete Temperature, o F: 73 ASTM C1064 Ambient Temperature, o F: 55 ASTM C-1064 Plastic Unit Weight, pcf: Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No. ID (inches) (sq. inches) Tested (days) (lbs) (psi) 1 1 6.00 28.27 11/26/2001 7 85,110 3,010 1 2 6.00 28.27 11/26/2001 7 84,690 2,990 Average 3,000 1 3 12/17/2001 28 1 4 12/17/2001 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page I of 3 o,-LLw,,o~ CONCRETE COMPRESSIVE STRENGTH TEST ENGINEERING, Report Number: 94011204.0069 8901 Carpenter Frwy., Suite #100 Service Date: November 19, 2001 Dallas, Texas 75247 (214) 630-1010 Client: TNA North American, Inc. Report Date: November 27, 2001 Attn: Terry Raley Project: Sales Office & Warehouse Fac. 1321 Valwood Parkway, Suite 440 Coppell, Texas Carrollton TX 75006 Project Number: 94011204 Material Information Sample Information Specified Strength: 3000 psi @ 28 Days Sample Time: 9:00am Date Cast: November 19, 2001 Technician: Jason Kale Batch Time: 7:33am Plant: 41 Weather Conditions: Windy, cloudy Supplier: TXI Accumulative Yards: 10 Truck No: 723 Ticket No: 3026832 Placement Method: Direct Discharge Mix I.D. No.: 9505 Sample Locations: A-D (Sample 3-A) Placement Location: Slab leaveout area around perimeter of bldg. Line 1-7 Field Test Data Test Result Specification Test Method Slump, inches: 6.00 2-4 ASTM C-143 Air Content, %: 3.3 N/A ASTM C-231 Concrete Temperature, o F: 71 ASTM C1064 Ambient Temperature, 0 F: 54 ASTM C-1064 Plastic Unit Weight, pcf: Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No. ID (inches) (sq. inches) Tested (days) (lbs) (psi) 2 1 6.00 28.27 11/26/2001 7 90,660 3,210 2 2 6.00 28.27 11/26/2001 7 92,440 3,270 Average 3,240 2 3 12/17/2001 28 2 4 12/17/2001 28 Note: The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 2 of 3 0,*LLw~0,-~-~o CONCRETE COMPRESSIVE STRENGTH TEST ~.d,.,.~,...,l~.~,, ENOI N E~I~'.,~, INC. Client: TNA North American, Inc. Project Number:9401 1204 Report Number: 94011204.0069 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Jason Kale J /~,;~/'//J j Report Distribution: (1) TNA North American, Inc. (1) FACServices Inc (1) Carrell Poole & Yost Architecture (1) David Kent Reviewed by: (1) R L Goodson Consulting Engineers (1) City of Coppell - Bldg Insp Eric J. Cleveland, P.E. (1) Pacific Builders Inc (1) City of Coppell - Constr Insp Senior Project Engineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 3 of 3 0,-~w~-.~.~