Loading...
Freeport NIP(2.2)-LR011121REPORT OF STRUCTURAL STEEL OBSERVATION U-4~,d,,,,,,,,,f]r,,~,,,~ Report Number: 94011204.0057 ~,-,~a~,~. 8901 Carpenter Frwy., Suite #100 Service Date: November 9, 2001 Dallas, Texas 75247 (214) 630-1010 Client: TNA North American, Inc. Report Date: November 21,2001 Attn: Terry Raley Project: Sales Office & Warehouse Fac. 1321 Valwood Parkway, Suite 440 Coppell, Texas Carrollton TX 75006 Project Number: 94011204 Services: Structural steel observation. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for structural steel observation. A visual observation was conducted on the Roof Level Framing between lines 1 to 7 and A to D as noted below. 1. Anchor bolts were found to be compliant. 2. Girder to column and girder to panel connections were found to be incomplete. 3. Joist seat welds were found to be incomplete. 4. Joist bridging was found to be incomplete. 5. Beam to column and beam to seat connections were found to be incomplete. 6. Welder certifications were unavailable for review. 7. Perimeter angle was found to be incomplete. Technician: Melvin Luttrell ~~"//~g Report Distribution: , Inc. (1) TNA North American, Inc. (1) FACServices Inc (1) Carrell Poole & Yost Architecture (1) David Kent Reviewed by: (1) R L Goodson Consulting Engineers (1) City of Coppell - Bldg Insp Eric J. Cleveland, P.E. (1) Pacific Builders Inc (1) City of Coppell - Constr Insp Senior Project Engineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 ~sos~..~,~