Freeport NIP(2.2)-LR011006 REPORT OF REINFORCING STEEL OBSERVATION 8901 Ca.r~nter Frwy., Suite #100 Dallas, Texas 75247 Service: 1~ ~ Report No.: 94011204.0043 Date of Client Nf~_~_~ / Project No.: 94011204 Cl~lint: ~'_N_A North Ame~i~n, Inc. Project: Sales Office & Warehouse Fac. I 1_321 .V. alwood~rkway, Suite 440 Coppell, Texas xas 75006 Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: Current field set Locations/Items Observed: Floor Slab, Main Building Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tied Propedy 3ar Size X Proper Bar Placement X Ties and Spaces Bar Grade X Propedy Tied X Stirrup sPacing/Type Ret)ar Clean X Dowel Bars in Place X Welded Splices Form Clean X Proper Bar Supports X Mechanical Splices Number of Bars X Lapped Splices X Proper Cover X Discrepancies/Comments: The following was noted at the time of observation. 1. Slab will be concreted with a laser screed. Chairs will be added at the time of concrete placement. 2. Column leaveout diamonds are to be cut after concrete is placed. 3. Extra #4 reinforcing steel bars were added at 1 foot 6 inches from the center line on four (4) comers. Technician: P. Green Reoort Distribution: C (1) TNA North American, Inc. (1) FACServices Inc (1) Carrell Peele & Yost Architecture (1) David Kent (1) R L Goodson Consulting Engineers (1) City of Coppell - Bldg Insp (1) Pacific Builders Inc (1) City of Coppell - Constr Insp Senior Project Engineer 309sks This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of HBC Engineering, Inc.