Loading...
PA9703-CS 961018DATE: TO: FROM: SUBJECT: Memorandum October 18, 1996 Ken Griff'm, City Engineer Andy Brown East Community ~k Ca~ and ~ ~e~on. Please find attached a photo copy of a proposal for design and consm/ction of the above referenced project. This proposal is submitted by/ones & Carter, Inc., through BeneR Ratlift, P.E., per request from this department. I would appreciate your review and comments regarding this proposal. We have discussed this project several times in the past. Currently, this project is funded in the city's C.I.P., at $80,000. Thank you for your assistance with this matW, r. If I can provide any additional information or address any questions you may have regarding this proposal please don't hesitate to call me. GDS/gls Attachment Copy to: Chy Phillips, Deputy City Manager 12000 Ford Road, Suite 180 Dallas, Texas 75234 JONES & CARTER, INC. 214/488-3880 F~ 21~3882 October 15, 1996 City of Coppell P.O. Box 478 Coppell, Texas 75019 Anention: Mr. Gary Sims Director of Leisure Services Reference: Andy Brown East Park Drainage Improvements and Trail Extension (J&C No. D0001-003) Dear Gary: Jones & Carter, Inc. appreciates. the opportunity to submit this proposal for the Design and Construction of the above referenced project. Based upon our previous meetings and our understanding of the scope of work, we propose to perform the following services: ~v~.i~? l. Prepare plans for the construction of an extension of the jogging path and erosion control measures along the drainage channel downstream of Parkway Boulevard immediately east of the parking lot for Andy Brown East Park. Plans shall include horizontal and vertical alignment for the path in accordance with ADA standards from the box culvert under Parkway to the nearest point in the existing parking lot: sections. details and retaining wall design for the path where it connects to the existing box culvert under Parkway Blvd.; sections. details and structural design of the downstream erosion radmg plans for affected areas of the park. 2. Prepare plans for an alternate bid to extend the jogging path to connect to the existing path system in the park near the existing accessible parking spaces. 3. Prepare specifications and contract documents for the construction of the improvements including general and special conditions of agreement. bond and insurance requirements, bid tbrm. technical specifications for materials and construction techniques, and special provisions to the coreract. 4. Assist the city in the advertisement for bids, issuance of bid documents to prospective bidders through our office, receipt and tabulation of bids, and recommendation for the award of contract to the City Manager / City Council. 5. Assist the City staff during construction by making periodic trips to the construction site to observe the general progress of construction and conformance with the plans and specifications. In addition, we shall review laboratory reports, shop drawings, pay requests and assist with the final inspection of the project upon completion. City of Coppell - Andy Brow~"'st Park October 15, 1996 Page 2. 6. Assist the City staff with public relations activities including Park Board meetings, presentations to City Council, and preparation of press releases if desired. ,.~ In consideration of the defined scope of work, we respectfully request flurap sum fee of $8,800.00. This fee shall include complete design services and the delivery of plans and specifications with the standard of care for projects of this nature and the coordination work with the Owner and associated with the same. This agreement shall be subject to our General Conditions of Agreement and the associated fee shall be payable on a monthly basis as determined by the overall percent complete of the work during the previous month. Lump sum fees do not reflect the amount of any excise, VAT, gross receipts, or sales tax that may be imposed. Said taxes shall be added to the compensation as stated in the proposal. The attached General Conditions of Agreement, Exhibit A, shall apply to this contract as if included verbatim herein. The proposed fees shall be considered in their entirety for the scope of services. Should you wish to contract with us for only a portion of the work identified, we reserve the right to negotiate individual scope items on their own merits. This proposal shall be valid for sixty (60) days from this date and may be extended upon approval of this office. Jones & Carter, Inc. appreciates the oppornmity to continue to be of service to the City of Coppell and we look forward to the successful completion of this project, This proposal may be considered an agreement, upon authorized signature below and return of one copy to our office. ff you have any questions regarding this proposal, please do not hesitate to contact me. Sincerely, Bennett Ratlift. P.E. WBRFor Enclosure Authorized by: Date: GENERAL CONDITION OF AGREEMENT AUTHORIZATION FOR WORK TO PROCEED STANDARD OF PRACTICE ENG]NEBRalm:,tomaintainworhzn'Compemad~Inmnneto covexallofitsovtnlgnomle, lmgapdinl~l~aminlsm'vic~forfls~ CLIENT under this AGRSEMI~NT. BILLING AND PAYMENT The CLIENT. recognizing thai timely payment is a material pan of the consideration of t~is AGREEMENT. shall pay I&C for services perforamd OV'NERSHIP / REUSE OF DOCU]VIENTS OPINIONS OF PROBABLE CONSTRUCTION COST LIMITATION OF LIABILITY INDEMNIFICATION CONSEQUENTIAL DAMAGES TERMINATION SUCCESSORS AND ASSIGNS SEVERABILITY CONTROLLING LAW