Villages of CC 6-CS 960123 ENGINE~INO · SURVEYING · PLANNING 4040
6330 Belt I_ine Roa=l . SuiteC · Gadand, Texas 75043 · (214} 226-2967 · /:AX 228-~946
.famuu'7 2 1996
Mr. John ,-dams
Residence mt
Arlington texas
Re: VT'~AGES OF COTTONWOOD PHASE VI
CC,~PELL, TEXAS '
Dear tvfr. -dams:
As the for al repre, scntative of Jim $owell Construction Co.. Inc. we hereby agree to perform
the follo'~ g improvements on your property:
1. Regrading and rcprncessin~ of material as represented on the gradit~
prepared by Tipton F.,nglneering, Inc. All earth work to be .p~rmed unde[ 790
standards. All areas of dismrbenc~ to be hydromuiched.. /~ /~'-~ .y
2. lira So~,~II Construction Co.. Inc. agrees to extend Clifton Court to ),our eastern
property line along with appropriate water and sewer stub outs for future
connections.
3. $olm Adams agrees to allow gradit~ on the propert), as represented by plans
prepared by Tipton E~L~rinjh,I~lor~ with con~tmction of a t~mporary turn
around. ~ $~) ~~
4. lira Sow¢ll Construction Co., Inc. agISes ~ reestablish th~. f~ncin~ to~on~inal
5. J'im $oweJ! Constmction,~Eo. Inc. agreca to pay for cngi~rLog scrvi~a .
performed by Lou Ho~ne on be. half of $otm Adams.
6.Richard'lipt°n l~nccri~gHovas, P.E.w;ll~c°°rdina're~,wk~--* u lome. and our designated engineer,
As you ar- away, this process will benefit both properties and eliminate future developmc~g
cos[s for ~[h parties. If you are in agreement with the above descr[bed improveme~ and
commirm~ ~ execute below.