Loading...
Villages of CC 6-CS 960104 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Village at Cottonwood Creek, Section VI, Replat of Lot 4, Block D, to allow the development of a recreational center on 13,440 square feet of land to be used by the homeowners of the Village at Cottonwood Creek subdivision, located on the south side of Hardwick Court and along the north side of Parlcway Blvd., at the request of Tipton Engineering, Inc. DRC DATE: December 28, 1995 and January 4, 1996 CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer (304-3679) COMMENT STATUS: PRELIMINARY ,/FINAL SUBSEQUENT No Comments. DEVELOPMENT REVIEW COMMI EE ENGINEERING COMMENTS ITEM: PD-I$O, Village at Cottonwood Creek Community Recreational Center, zoning change from "SF-7" (Single family-7) to "PD Recreational Center" (Planned Development, Recreational Center), to allow the development of a recreational center on 13,440 square feet of land to be used by the homeowners of the Village at Cottonwood Creek subdivision, located on the south side of Hardwick Court and along the north side of Parkway Boulevard, at the request of Tipton Engineering, Inc. DRC DATE: December 28, 1995 and January 4, 1996 CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer (304-3679) COMMENT STATUS: PRELIMINARY 1. The parking proposed may be inadequate for the recreation center/pool proposed. This should be reevaluated.