Loading...
Villages of CC 6-CS 951208 TIPTON ENGINEERING, INC. ENGINEERING * SURVEYING * PI,ANNING 4040 6330Bel:LneRca,~ * SuteC * Gar'anc, Te.,~s~SC43 · 2'4 2.25-295- · :,~' ~-:- _~c December 8, 1995 Mr. Michael Martin, E.I.T Assistam City Engineer CITY OF COPPELL P.O. Box 478 Coppell, TX 75019 RE: VILLAGES AT COTTONWOOD CREEK SECTION VI COPPELL, TEXAS Dear Mr. Martin: Accompanying are our responses listed in correlation to your comments dated November 10, 1995. 1) An easement has been forwarded to the City of Coppell. An additional copy is provided with this submittal. 2) An original and two copies of the filed drainage easemem is provided with this submittal. 3) The owner is aware of this situation. 4) Additional erosion control has been added to the site. A check for $6,000 covering the erosion control maintenance is also included in this package. 5) Additional earthwork on this portion of the project has been completed. ~ .... .": .....' ~, - :' -" ~"~-. ~> .6) ~ 80 linear feet of handrail as shown on the accompa~,ing sketch will be constructed by .. - ~'~ the end of 1995. A letter from the Homeowners Association stating they will maintain the handrail is also provided. 7) This concern has been addressed. "· 8) Two sets of As-Built plans have been provided and the contractors have provided the appropriate bonds. .... -7 9) Two additional connections to the hike and bike trail will be constructed by the end of .: e 1995. 10) ~As-Built' plans have been provided. 11) This concern has been addressed. 12) Additional rip-rap rock has been added downstream of the weir. 13) A check for $3,120.00 covering the cost of future hike and bike trail is included in this submittal. If you have any questions, or if we can be of any further assistance, please do not hesitate to contact our office. Sincerely, TIFrON ENGINEERING, L'~'C. Richard Hovas, P.E. Vice President RH/ce Enclosure