Loading...
Villages of CC 6-CS 950823 COPPELL STREET DIVISION MEMORANDUM DATE: August 23, 1995 TO: Larry Davis, Construction Inspector FROM: Per Birdsall, Interim Street Superintendent~ RE: Villages of Cottonwood Creek Phase VI - Walk Thru 7-18-95 Listed below are Street Division comments relative to 7-18-95 walk thru. Please make sure the contractor has a copy. * Approved set of "As Built" plans. * Rout and seal corner break at Hampton/Parkway left turn at median nose. * Hampton/Parkway - small bird bath west side of intersection. * Hampton - Lot 15. Rout and seal crub crack. * Fair Land Circle - reseal curb saw cuts in circle. * Fair Land/Graywood Lane. Reseal intersection on northside at Fair Land dead end. * Graywood Lane - Route and seal curb at Lot 28 adjacent sewer cleanout. * Graywood Lane/Pedmore Drive -- Possible bird bath southwest corner. * Pedmore Drive at Eye Brow -- Possible bird bath southwest side. * Gifford Lot 1 across from Pedmore -- curb ear missing. * Gifford at Parkway -- Patch brick lug at sidewalk northwest corner. * Gifford/Parkway -- Reseal all of low spots in left turn lane, including curb eastbound direction. * Gilford/Parkway -- Westbound left turn direction where median nose shortened, rout and seal corner break existing pavement. * Gifford Lot 29, 28, 27 -- Possible bird bath. * Hardwick Ct. -- Rout and seal alley return beside drop inlet. * Gifford/Clifton Ct. -- Possible bird bath at southwest corner. * Layton Drive/Loxley Drive -- Southwest corner, manhole crack was routed -- needs to be sealed. * Graham Drive -- Remove graffiti Lot 8. * Hampton Drive Alley Lot 4 -- Rout and seal corner crack. * Graywood Court Alley West and South needs cleaned out. * All speed limit and no parking signs for westbound Parkway. * Check and reseal redwood headers. PB/bc VILCO.PB