Loading...
Villages of CC 6-CS 941202 TIPTON ENGINEERING, INC. ENGINEERING · SURVEYING * PLANNING 4040 6330 BeltLine Road · SuiteC · Garland, Texas 75043 · (214) 226-2967 · FAX 226-1946 December 2, 1994 Mr. Mike Martin CITY OF COPPELL 255 Parkway Blvd Coppell, TX 75019 RE: VILLAGES AT COTTONWOOD CREEK - SECTION VI COPPELL, TX Dear Mr. Martin: Herewith is a copy of the excavation contract for your use in verifying the inspection fee for the above referenced project. Street, Alley & Slope 16,000 CY @ $1.20 = $19,200.00 TOTAL $19,200.00 Our calculation of thc inspection fee at 2% is $384.00. Please notify us if you have any questions or if we can be of any further assistance, please do not hesitate to contact our office. 5incerely, TIPTON ENGINEERING, INC. ~ Richard Hovas, P.E. Vice President RH/ce TIPTON ENGINEERING, INC. ENGINEERING · SURVEYING · PLANNING 4040 6330 Belt Line Road · SuiteC · Garland, Texas 75043 · (214) 226-2967 · FAX226-1946 December 2, 1994 Mr. Mike Martin CITY OF COPPELL 255 Parkway Bird Coppell, TX 75019 RE: VILLAGES AT COTTONWOOD CREEK - SECTION VI COPPELL, TEXAS Dear Mr. Martin: Please f'md enclosed the following items for your use: 1) Fee Calculation Letter 2) NOI 3) Development Permit 4) 10 sets of prints 5) Development Permit Application 6) Check in the Amount of $384.00 If you have any questions or if we can be of any further assistance, please do not hesitate to contact onr office. Sincerely, TIFFON ENGINEERING, INC. Richard Hovas, P.E. Vice President RH/ce Enclosure SEC'I~ON P (Continued) Item Unit Price Amount 1. Unclassified Site Clearing LS 1 8,750.00 8,750.00 On Site/Lake Area Eib, bt Thousand Seven Hundred Fifty DOLI,a~S No cents per lump sum 2. Unclassified Street/Alley Excavation CY 16,000 1~20 19,200.00 One DOIJ. AR Twenty cents per cubic yard 3. Unclassified Lot Excavation CY 12,000 1.20 14,400.00 One DOLLAR Twenty cents per cubic yard 4. Unclassified Excavation from CY 80,000 1.30 104,000.00 Proposed Lake (Placed on Lots) One DOLLAR Thirty cents per cubic yard 5. Lot Benching (With Excavation) EA 183 100.00 18,300.00 One Hundred DOIA. ARS No cents per each 6. Erosion Control LF 5,000 1.55 7,750.00 One DOLLAR Fifty Five cents per linear foot TOTAL EXCAVATION { 172,400.00 { P-4 of 5 FILE No. 635 12×02 '94 14:33 ID:TIPTON ENGINEERING 214 226 1946 PIqGE 4 ~TY ~ ~ALL&~ ~ C~ OF ~LL; ~ or r~z~: JIM S~ELL CONSTRUCTI~ CO., INC. detomL~itt~ tbac t~ pro~e~ ~velo~t IS locit~ downiest for ~fonce uith th dotmlo~n~ at~mrds Excavotion ~iI~a~e at Cotton~ Cr~k, ~ctton VI - ]oca~d east of coppeli Road - north of Park~a~ ~u]eva~ "' M~t~IX to th p~pmd downiest, ~u ifa b~ ( ) 'Pen/tree met u~t m ~rtlZicmtlm %~ · ~imtmr~ fz~emm%~l ~L~IQi IRf~ver Li hight, uflLft feel M ether fmctor. BBO~SL~ d~th tM bile ( ) For g%%% /cctvitium, t~ p~ttu Blt /u~t i ~%tAg/~i~ IIIIHA?Vn. 6r Al~ltNzortM?on .... 12/0~ '94 12:.O..,Cr,~ 2714 TIPTON ENGINEERING, INC. 6330 BELTLINE RD., STE. C PH. 214-226-2967 GARLAND, TEXAS 75043 /~ c~ I~/-'/'32'1t5/'1110 ' 19.7__~ PAY /~ /7 /' · o~.~ ~-~ ~, ~~. , . ~ · ~OLLARS ,; ,'OOS?~h,' ~:~OO~SO~; ,'OS&OO~~,' Notice M Inmflt.(NO0 for ~31orm WIMr Oh~ ,:ti_. ~. t I A~lOQIlmcl with Inclua Village at Cottonwood Creek Phase 6 3131 McKinney Avenue Suite 200 Dallas TX PAY TO THE ORDER OF. City of Coppell 2 Dec 13 1994 Two.Hundred Seventy Four Thousand One Hundred Twenty Six Dollars & r~ Compass Bank (214) 238-6600 Dallas. Texas (746) FOR Developmental Fees/City Fees m: l, ~, i, qO ?hh Sm-' 88-744/I 119 746 10/1 O0 ' m 0 CASH RECEIPT . Dote Received From \ )~-',~',-~ Nddress AMT. OF ACCOUN1 A~T. PAID BALANCE DUE HOW Paid CHECK MONEY ORDER