Villages of CC 6-CS 941202 TIPTON ENGINEERING, INC.
ENGINEERING · SURVEYING * PLANNING 4040
6330 BeltLine Road · SuiteC · Garland, Texas 75043 · (214) 226-2967 · FAX 226-1946
December 2, 1994
Mr. Mike Martin
CITY OF COPPELL
255 Parkway Blvd
Coppell, TX 75019
RE: VILLAGES AT COTTONWOOD CREEK - SECTION VI
COPPELL, TX
Dear Mr. Martin:
Herewith is a copy of the excavation contract for your use in verifying the inspection fee for the
above referenced project.
Street, Alley & Slope 16,000 CY @ $1.20 = $19,200.00
TOTAL $19,200.00
Our calculation of thc inspection fee at 2% is $384.00. Please notify us if you have any
questions or if we can be of any further assistance, please do not hesitate to contact our office.
5incerely,
TIPTON ENGINEERING, INC. ~
Richard Hovas, P.E.
Vice President
RH/ce
TIPTON ENGINEERING, INC.
ENGINEERING · SURVEYING · PLANNING 4040
6330 Belt Line Road · SuiteC · Garland, Texas 75043 · (214) 226-2967 · FAX226-1946
December 2, 1994
Mr. Mike Martin
CITY OF COPPELL
255 Parkway Bird
Coppell, TX 75019
RE: VILLAGES AT COTTONWOOD CREEK - SECTION VI
COPPELL, TEXAS
Dear Mr. Martin:
Please f'md enclosed the following items for your use:
1) Fee Calculation Letter
2) NOI
3) Development Permit
4) 10 sets of prints
5) Development Permit Application
6) Check in the Amount of $384.00
If you have any questions or if we can be of any further assistance, please do not hesitate to
contact onr office.
Sincerely,
TIFFON ENGINEERING, INC.
Richard Hovas, P.E.
Vice President
RH/ce
Enclosure
SEC'I~ON P (Continued)
Item Unit Price Amount
1. Unclassified Site Clearing LS 1 8,750.00 8,750.00
On Site/Lake Area
Eib, bt Thousand Seven Hundred Fifty DOLI,a~S
No cents
per lump sum
2. Unclassified Street/Alley Excavation CY 16,000 1~20 19,200.00
One DOIJ. AR
Twenty cents
per cubic yard
3. Unclassified Lot Excavation CY 12,000 1.20 14,400.00
One DOLLAR
Twenty cents
per cubic yard
4. Unclassified Excavation from CY 80,000 1.30 104,000.00
Proposed Lake (Placed on Lots)
One DOLLAR
Thirty cents
per cubic yard
5. Lot Benching (With Excavation) EA 183 100.00 18,300.00
One Hundred DOIA. ARS
No cents
per each
6. Erosion Control LF 5,000 1.55 7,750.00
One DOLLAR
Fifty Five cents
per linear foot
TOTAL EXCAVATION { 172,400.00 {
P-4 of 5
FILE No. 635 12×02 '94 14:33 ID:TIPTON ENGINEERING 214 226 1946 PIqGE 4
~TY ~ ~ALL&~ ~
C~ OF ~LL;
~ or r~z~: JIM S~ELL CONSTRUCTI~ CO., INC.
detomL~itt~ tbac t~ pro~e~ ~velo~t IS locit~
downiest for ~fonce uith th dotmlo~n~ at~mrds
Excavotion
~iI~a~e at Cotton~ Cr~k, ~ctton VI - ]oca~d east of
coppeli Road - north of Park~a~ ~u]eva~ "'
M~t~IX to th p~pmd downiest, ~u ifa b~
( ) 'Pen/tree met u~t m ~rtlZicmtlm %~ · ~imtmr~ fz~emm%~l
~L~IQi IRf~ver Li hight,
uflLft feel M ether fmctor. BBO~SL~ d~th tM bile
( ) For g%%% /cctvitium, t~ p~ttu Blt /u~t i ~%tAg/~i~
IIIIHA?Vn. 6r Al~ltNzortM?on .... 12/0~ '94 12:.O..,Cr,~
2714
TIPTON ENGINEERING, INC.
6330 BELTLINE RD., STE. C PH. 214-226-2967
GARLAND, TEXAS 75043 /~ c~ I~/-'/'32'1t5/'1110
' 19.7__~
PAY /~ /7 /'
· o~.~ ~-~ ~, ~~. , .
~ · ~OLLARS
,;
,'OOS?~h,' ~:~OO~SO~; ,'OS&OO~~,'
Notice M Inmflt.(NO0 for ~31orm WIMr Oh~ ,:ti_. ~. t I A~lOQIlmcl with Inclua
Village at Cottonwood Creek Phase 6
3131 McKinney Avenue Suite 200
Dallas TX
PAY
TO THE
ORDER OF.
City of Coppell
2
Dec 13 1994
Two.Hundred Seventy Four Thousand One Hundred Twenty Six Dollars &
r~ Compass Bank
(214) 238-6600
Dallas. Texas (746)
FOR Developmental Fees/City Fees
m: l, ~, i, qO ?hh Sm-'
88-744/I 119
746
10/1 O0 '
m
0
CASH
RECEIPT . Dote
Received From \ )~-',~',-~
Nddress
AMT. OF
ACCOUN1
A~T. PAID
BALANCE
DUE
HOW Paid
CHECK
MONEY
ORDER