Loading...
ST9302-LR011105 ALPHA TESTING, INC. Concrete Test 2209 Wisconsin St., Suite 100 , omt, ress,on Dallas, Texas 75229 -bo"or* (972) 620-8911 Tested For: CITY OF COPPELL Our Report No.: 98881-224 ATTN: KEN GRIFFIN Issue Date: 11/0512001 255 PARKWAY BLVD. Fax Number: (972) 304-3570 Project Desc: SANDY LAKE ROAD PROJ NO. ST 93 COPPELL, TEXAS FIELD DA TA Placement Location: PAVING, MEDIAN CURB ON MACARTHUR RD. @ STATION 4+25 Date Placed: 10/3/01 Plant Number: 42-6.0 SK Time Placed: 12:15 PM Delivery Tlcket No.: 2993115 Slump (ASTM C-143): 2.75 Made By:. ALPHA Air Content: 5.0 (ASTM C-173) Cured Specification: ASTM C-31 Air Temperature: 92 Specimen Temperature: 84 Date Received: 10/4/01 Delivery Method: PICKED UP BY ALPHA Field Data Submitted By: MCMILLAN, JOHN Mix Data Submitted By:. TXI CYLINDER COMPRESSION TEST RESUL TS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: 1'~38: Spec: Tested: (Da~sl: Len~h Width Diameter Sq. In. Load: PSI: 322 LAB C-1231 10/10/01 7 12 N/A 6 28.27 120420 4250 323 LAB C-1231 10/31/01 28 12 N/A 6 28.27 143070 5060 324 LAB C-1231 10/31/01 28 12 N/A 6 28.27 142450 5030 325 LAB HOLD HOLD 12 N/A 6 28.27 0 ' Specifications: 28 3500 Results to Date: PASS Notes: CC: CITY OF COPPELL, ED BELL CONSTRUCTION Respectfully Submitted By: ~'f~ ~/'~v~ of Alpha Testing, Inc. Our test results and relx~ls are for the exclusive use of the Client their ded~nated receplents ou file In our office) and shall not be reproduced and/or distributed except with exlxess approval of ALPHA. The ~se of oar name and test results must receive our written apl)roval. Test resulls and reports apply only to the samples tested and/or observed, and are not IndlcaOve of the qualities of apparenOy identical or similar specimens.